Indian Institute of Science Bangalore
(IISc Bangalore)Last Updated: Jul 26, 2026
Established
1909
Campus Size
400.00 Acres
Total Students
4,500
Faculty
500
Student-Faculty
9:1
What are the cutoffs for Indian Institute of Science Bangalore in 2026?
For 2026, the headline cutoff at Indian Institute of Science (IISc) Bangalore is the JoSAA Round 1 closing rank of 3552 (JEE Advanced All India Rank, General category) for the newly launched B.Tech in Aerospace Engineering, released on June 13, 2026. IISc Bangalore admits undergraduates entirely through national entrance exams: JEE Advanced and JEE Main (for the four-year B.Tech and the B.S. Research programmes) and IIT JAM (for the Integrated PhD route). Unlike older IISc admissions that ran through a standalone form, the B.Tech programmes now go through JoSAA counselling alongside the IITs. As a reference point from the previous cycle, the most competitive B.Tech branch, Mathematics and Computing, closed at JEE Advanced rank 856 (General) in 2025, so aspirants should benchmark against a sub-1000 General rank for the established programme and the wider 3552 band for the first-year Aerospace seat.
The sections below break the closing ranks down by year, by programme and by category using IISc Bangalore's own published cutoff data so you can judge your admission chances precisely.
Year-Wise Cutoff Trends (2024-2026)
This table tracks how the closing rank for IISc Bangalore's flagship B.Tech in Mathematics and Computing (General category, JEE Advanced) has moved across cycles, alongside the 2026 JoSAA Round 1 cutoff for the new Aerospace Engineering branch. It answers the core question every aspirant asks: is the rank I need going up or down each year? Read the rank as a closing All India Rank in JEE Advanced, where a lower number means tougher competition.
| Year | Course/Branch | Category | Closing Rank (JEE Advanced) |
|---|---|---|---|
| 2026 | B.Tech Aerospace Engineering | General | 3552 |
| 2025 | B.Tech Mathematics and Computing | General | 856 |
| 2024 | B.Tech Mathematics and Computing | General | 708 |
| 2023 | B.Tech Mathematics and Computing | General | 757 |
The takeaway: the General closing rank for Mathematics and Computing tightened from 757 in 2023 to 708 in 2024, then loosened to 856 in 2025 as the seat pool and applicant preferences shifted. The 2026 figure of 3552 belongs to the brand-new Aerospace Engineering programme and is not directly comparable to the older branch, because a first-year programme has no demand history; expect it to settle in future cycles once awareness builds.
Course-Wise Cutoff at Indian Institute of Science Bangalore
IISc Bangalore's undergraduate admissions split across two main tracks: the four-year B.Tech and the four-year B.S. (Research) programme, each with its own closing ranks. The table below gives the 2025 JEE Advanced category-wise closing ranks for the B.Tech (Mathematics and Computing) seat and the B.S. (Research) seat, plus the 2026 JoSAA Round 1 General cutoff for B.Tech Aerospace Engineering. It answers which programme is reachable at your rank and how much the bar drops across reserved categories.
| Programme | Year | Category | Closing Rank (JEE Advanced) |
|---|---|---|---|
| B.Tech Aerospace Engineering | 2026 (JoSAA R1) | General | 3552 |
| B.Tech Mathematics and Computing | 2025 | General | 856 |
| B.Tech Mathematics and Computing | 2025 | EWS | 130 |
| B.Tech Mathematics and Computing | 2025 | OBC-NCL | 446 |
| B.Tech Mathematics and Computing | 2025 | SC | 265 |
| B.Tech Mathematics and Computing | 2025 | ST | 257 |
| B.Tech Mathematics and Computing | 2025 | General-PwD | 37 |
| B.S. (Research) | 2025 | General | 2263 |
| B.S. (Research) | 2025 | EWS | 978 |
| B.S. (Research) | 2025 | OBC-NCL | 3073 |
| B.S. (Research) | 2025 | SC | 770 |
| B.S. (Research) | 2025 | ST | 616 |
| B.S. (Research) | 2025 | General-PwD | 40 |
The clear pattern: the B.S. (Research) programme is more accessible by rank than B.Tech Mathematics and Computing, with a 2025 General closing rank of 2263 versus 856 for the B.Tech branch. Reserved-category ranks are markedly relaxed, with SC closing at 770 and ST at 616 for B.S. (Research), and SC 265 and ST 257 for the B.Tech seat. The PwD route closes very low at 37-40, reflecting limited supernumerary seats.
B.S. (Research) cutoffs by entrance exam (2025)
IISc Bangalore fills B.S. (Research) seats through three exams: JEE Advanced, JEE Main and IIT JAM (for the Integrated PhD pathway). The table below shows the 2025 closing ranks for the JEE Main route and the IIT JAM route, which matter because a candidate who misses the JEE Advanced cut can still enter through JEE Main. Read each as a 2025 closing rank within that exam's ranking system.
| Exam / Programme | Year | Category | Closing Rank |
|---|---|---|---|
| JEE Main - B.S. (Research) | 2025 | General | 903 |
| JEE Main - B.S. (Research) | 2025 | EWS | 1214 |
| JEE Main - B.S. (Research) | 2025 | OBC-NCL | 1665 |
| JEE Main - B.S. (Research) | 2025 | SC | 581 |
| JEE Main - B.S. (Research) | 2025 | ST | 314 |
| IIT JAM - Integrated PhD | 2025 | General | 746 |
Through the JEE Main route, the 2025 General closing rank for B.S. (Research) was 903, comparable to the B.Tech bar, while SC and ST candidates closed at 581 and 314 respectively. The IIT JAM Integrated PhD General closing rank of 746 in 2025 confirms that the research-PhD entry is sharply selective even though it sits outside the JEE system.
Cutoff Trend Analysis
The B.Tech cutoff at IISc Bangalore has stayed in a tight, elite band rather than rising or falling sharply: the Mathematics and Computing General closing rank went 757 (2023) to 708 (2024) to 856 (2025), a swing driven by how top-1000 JEE Advanced rankers traded off an IISc seat against established IIT branches, not by any dilution in standards. The bigger 2026 story is structural: IISc entered JoSAA counselling and launched three new B.Tech branches (Aerospace Engineering, Mechanics and Computing, Materials Science and Engineering) alongside Mathematics and Computing, and the first-ever Aerospace Engineering General cutoff landed at JEE Advanced rank 3552 in JoSAA Round 1. Because this is a debut programme with no historical comparison, that 3552 figure is likely to tighten in later rounds and future years as candidate awareness grows. Realistically, a General-category aspirant should target a JEE Advanced rank inside the top 900 to be competitive for Mathematics and Computing, while the new branches and the B.S. (Research) programme (General closing 2263 in 2025) offer genuine room up to and beyond rank 3000. Reserved-category candidates have meaningfully wider windows, with SC and ST B.Tech ranks closing around 265 and 257 in 2025.
IISc Bangalore CAT Cutoff (2026, 2025, 2024, 2023)
| Year | Branch / Programme | Course | Category | Cutoff Score |
|---|---|---|---|---|
| 2026 | - | M.Mgt | General | 98.85 |
| 2026 | - | M.Mgt | OBC | 96.75 |
| 2026 | - | M.Mgt | EWS | 96.00 |
| 2026 | - | M.Mgt | General | 99.00 |
| 2026 | - | M.Mgt | OBC | 98.00 |
| 2026 | - | M.Mgt | EWS | 98.00 |
| 2026 | - | M.Mgt | SC | 94.00 |
| 2026 | - | M.Mgt | ST | 94.00 |
| 2025 | - | M.Mgt | General | 98.00 |
| 2025 | - | M.Mgt | OBC | 94.00 |
| 2025 | - | M.Mgt | EWS | 96.00 |
| 2025 | - | M.Mgt | SC | 90.00 |
| 2025 | - | M.Mgt | ST | 72.00 |
| 2025 | - | M.Mgt | General-PwD | 87.00 |
| 2025 | - | M.Mgt | General | 98.87 |
| 2025 | - | M.Mgt | EWS | 96.98 |
| 2025 | - | M.Mgt | OBC | 95.23 |
| 2025 | - | M.Mgt | SC | 91.94 |
| 2025 | - | M.Mgt | ST | 73.78 |
| 2025 | Round 1 | M.Mgt | General | 98.00 |
| 2025 | Round 1 | M.Mgt | EWS | 96.00 |
| 2025 | Round 1 | M.Mgt | OBC | 94.00 |
| 2025 | Round 1 | M.Mgt | SC | 90.00 |
| 2025 | Round 1 | M.Mgt | ST | 72.00 |
| 2025 | - | M.Mgt | General | 98.00 |
| 2025 | - | M.Mgt | OBC | 94.00 |
| 2025 | - | M.Mgt | SC | 90.00 |
| 2025 | - | M.Mgt | ST | 72.00 |
| 2025 | - | M.Mgt | General | 98.00 |
| 2025 | - | M.Mgt | EWS | 96.00 |
| 2025 | - | M.Mgt | OBC | 94.00 |
| 2025 | - | M.Mgt | SC | 90.00 |
| 2025 | - | M.Mgt | ST | 72.00 |
| 2025 | - | M.Mgt | General | 98.87 |
| 2025 | - | M.Mgt | EWS | 96.98 |
| 2025 | - | M.Mgt | OBC | 95.23 |
| 2025 | - | M.Mgt | SC | 91.94 |
| 2025 | - | M.Mgt | ST | 73.78 |
| 2025 | - | MBA | General | 98.00 |
| 2025 | - | MBA | EWS | 96.00 |
| 2025 | - | MBA | OBC | 95.00 |
| 2025 | - | MBA | SC | 91.00 |
| 2025 | - | MBA | ST | 74.00 |
| 2025 | - | M.Mgt | General | 98.00 |
| 2025 | - | M.Mgt | OBC | 95.00 |
| 2025 | - | M.Mgt | SC | 91.00 |
| 2025 | - | M.Mgt | ST | 74.00 |
| 2025 | - | M.Mgt | General-PwD | 88.00 |
| 2025 | - | M.Mgt | General | 98.87 |
| 2025 | - | M.Mgt | General | 98.87 |
| 2025 | - | M.Mgt | EWS | 96.98 |
| 2025 | - | M.Mgt | OBC | 95.23 |
| 2025 | - | M.Mgt | SC | 91.94 |
| 2025 | - | M.Mgt | ST | 73.78 |
| 2025 | - | M.Mgt | General | 98.00 |
| 2025 | - | M.Mgt | General | 98.00 |
| 2025 | - | M.Mgt | EWS | 96.00 |
| 2025 | - | M.Mgt | OBC | 94.00 |
| 2025 | - | M.Mgt | SC | 90.00 |
| 2025 | - | M.Mgt | ST | 72.00 |
| 2025 | Round 1 | M.Mgt | General | 98.87 |
| 2025 | Round 1 | M.Mgt | EWS | 96.98 |
| 2025 | Round 1 | M.Mgt | OBC | 95.23 |
| 2025 | Round 1 | M.Mgt | SC | 91.94 |
| 2025 | Round 1 | M.Mgt | ST | 73.78 |
| 2024 | - | M.Mgt | General | 98.87 |
| 2024 | - | M.Mgt | OBC | 95.23 |
| 2024 | - | M.Mgt | EWS | 96.98 |
| 2024 | - | M.Mgt | SC | 91.94 |
| 2024 | - | M.Mgt | ST | 73.78 |
| 2024 | - | M.Mgt | General | 98.87 |
| 2024 | - | M.Mgt | General | 99.00 |
| 2024 | - | M.Mgt | EWS | 96.00 |
| 2024 | - | M.Mgt | OBC | 96.00 |
| 2024 | - | M.Mgt | SC | 92.00 |
| 2024 | - | M.Mgt | ST | 74.00 |
| 2024 | - | M.Mgt | General | 98.87 |
| 2024 | - | M.Mgt | EWS | 96.98 |
| 2024 | - | M.Mgt | OBC | 95.23 |
| 2024 | - | M.Mgt | SC | 91.94 |
| 2024 | - | M.Mgt | ST | 73.78 |
| 2024 | - | M.Mgt | General | 98.87 |
| 2024 | - | MBA | General | 98.87 |
| 2024 | - | MBA | EWS | 96.98 |
| 2024 | - | MBA | OBC | 95.23 |
| 2024 | - | MBA | SC | 91.94 |
| 2024 | - | MBA | ST | 73.78 |
| 2024 | - | MBA | General-PwD | 88.87 |
| 2024 | - | M.Mgt | General | 98.87 |
| 2024 | - | M.Mgt | EWS | 96.98 |
| 2024 | - | M.Mgt | OBC | 95.23 |
| 2024 | - | M.Mgt | SC | 91.94 |
| 2024 | - | M.Mgt | ST | 73.78 |
| 2024 | - | M.Mgt | General | 98.87 |
| 2024 | - | M.Mgt | OBC | 95.23 |
| 2024 | - | M.Mgt | SC | 91.94 |
| 2024 | - | M.Mgt | ST | 73.78 |
| 2024 | - | M.Mgt | EWS | 96.98 |
| 2024 | - | M.Mgt | General | 98.87 |
| 2024 | - | M.Mgt | OBC | 95.23 |
| 2024 | - | M.Mgt | SC | 91.94 |
| 2024 | - | M.Mgt | ST | 73.78 |
| 2024 | - | M.Mgt | EWS | 96.98 |
| 2024 | - | M.Mgt | General-PwD | 88.87 |
| 2024 | - | M.Mgt | General | 99.00 |
| 2024 | - | M.Mgt | OBC | 98.00 |
| 2024 | - | M.Mgt | EWS | 98.00 |
| 2024 | - | M.Mgt | SC | 94.00 |
| 2024 | - | M.Mgt | ST | 94.00 |
| 2024 | - | M.Mgt | General | 98.87 |
| 2024 | Round 1 | M.Mgt | General | 98.87 |
| 2024 | - | M.Mgt | General | 98.87 |
| 2024 | Round 1 | M.Mgt | General | 98.87 |
| 2024 | Round 1 | M.Mgt | OBC | 95.23 |
| 2024 | Round 1 | M.Mgt | SC | 91.94 |
| 2024 | - | M.Mgt | General | 98.87 |
| 2024 | - | M.Mgt | EWS | 96.98 |
| 2024 | - | M.Mgt | OBC | 95.23 |
| 2024 | - | M.Mgt | SC | 91.94 |
| 2024 | - | M.Mgt | ST | 73.78 |
| 2024 | - | M.Mgt | General | 98.87 |
| 2024 | - | M.Mgt | General | 98.87 |
| 2024 | - | M.Mgt | General | 98.87 |
| 2024 | - | M.Mgt | OBC | 95.23 |
| 2024 | - | M.Mgt | EWS | 96.98 |
| 2024 | - | M.Mgt | SC | 91.94 |
| 2024 | - | M.Mgt | ST | 73.78 |
| 2024 | - | M.Mgt | General | 98.87 |
| 2024 | - | M.Mgt | General | 98.87 |
| 2024 | - | M.Mgt | General | 98.87 |
| 2024 | - | M.Mgt | OBC | 95.23 |
| 2024 | - | M.Mgt | SC | 91.94 |
| 2024 | - | M.Mgt | ST | 73.78 |
| 2024 | - | M.Mgt | EWS | 96.98 |
| 2024 | - | M.Mgt | General | 98.87 |
| 2024 | - | M.Mgt | General | 98.87 |
| 2024 | - | M.Mgt | OBC | 95.23 |
| 2024 | - | M.Mgt | SC | 91.94 |
| 2024 | - | M.Mgt | ST | 73.78 |
| 2023 | - | M.Mgt | General | 98.93 |
| 2023 | - | M.Mgt | OBC | 95.98 |
| 2023 | - | M.Mgt | SC | 88.68 |
| 2023 | - | M.Mgt | ST | 62.90 |
| 2023 | - | M.Mgt | EWS | 96.66 |
| 2023 | - | M.Mgt | General | 98.93 |
| 2023 | - | M.Mgt | EWS | 96.66 |
| 2023 | - | M.Mgt | OBC | 95.98 |
| 2023 | - | M.Mgt | SC | 88.68 |
| 2023 | - | M.Mgt | ST | 62.90 |
| 2023 | - | M.Mgt | General | 98.93 |
IISc Bangalore JEE Advanced Cutoff (2026, 2025, 2024, 2023, 2022)
| Year | Branch / Programme | Course | Category | Opening Rank | Closing Rank |
|---|---|---|---|---|---|
| 2026 | Round 1 | - | General | 156 | 3,552 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General-PwD | - | 40 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | General-PwD | - | 37 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General-PwD | - | 40 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General-PwD | - | 40 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General-PwD | - | 40 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | General-PwD | - | 37 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General-PwD | - | 40 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | General-PwD | - | 37 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | General-PwD | - | 37 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | General-PwD | - | 37 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General-PwD | - | 40 |
| 2025 | Round 1 | B.S. (Research) | General | - | 2,263 |
| 2025 | Round 1 | B.S. (Research) | OBC | - | 3,073 |
| 2025 | Round 1 | B.S. (Research) | EWS | - | 978 |
| 2025 | Round 1 | B.S. (Research) | SC | - | 770 |
| 2025 | Round 1 | B.S. (Research) | ST | - | 616 |
| 2025 | Round 1 | B.Tech | General | - | 856 |
| 2025 | Round 1 | B.Tech | OBC | - | 446 |
| 2025 | Round 1 | B.Tech | EWS | - | 130 |
| 2025 | Round 1 | B.Tech | SC | - | 265 |
| 2025 | Round 1 | B.Tech | ST | - | 257 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General-PwD | - | 40 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | General-PwD | - | 37 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General-PwD | - | 40 |
| 2025 | Round 1 | B.Tech | General | - | 856 |
| 2025 | Round 1 | B.Tech | EWS | - | 130 |
| 2025 | Round 1 | B.Tech | OBC | - | 446 |
| 2025 | Round 1 | B.Tech | SC | - | 265 |
| 2025 | Round 1 | B.Tech | ST | - | 257 |
| 2025 | Round 1 | B.S. (Research) | General | - | 2,263 |
| 2025 | Round 1 | B.S. (Research) | EWS | - | 978 |
| 2025 | Round 1 | B.S. (Research) | OBC | - | 3,073 |
| 2025 | Round 1 | B.S. (Research) | SC | - | 770 |
| 2025 | Round 1 | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | General-PwD | - | 37 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General-PwD | - | 40 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General-PwD | - | 40 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | General-PwD | - | 37 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General-PwD | - | 40 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | General-PwD | - | 37 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | General-PwD | - | 37 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | General-PwD | - | 37 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General-PwD | - | 40 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General-PwD | - | 40 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General-PwD | - | 40 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | General-PwD | - | 37 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General-PwD | - | 40 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | General-PwD | - | 37 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General-PwD | - | 40 |
| 2025 | - | B.Tech | General | 856 | 856 |
| 2025 | - | B.Tech | EWS | 130 | 130 |
| 2025 | - | B.Tech | OBC | 446 | 446 |
| 2025 | - | B.Tech | SC | 265 | 265 |
| 2025 | - | B.Tech | ST | 257 | 257 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | Round 1 | B.Tech | General | - | 856 |
| 2025 | Round 1 | B.Tech | OBC | - | 446 |
| 2025 | Round 1 | B.Tech | SC | - | 265 |
| 2025 | Round 1 | B.Tech | ST | - | 257 |
| 2025 | Round 1 | B.Tech | EWS | - | 130 |
| 2025 | Round 1 | B.S. (Research) | General | - | 2,263 |
| 2025 | Round 1 | B.S. (Research) | OBC | - | 3,073 |
| 2025 | Round 1 | B.S. (Research) | SC | - | 770 |
| 2025 | Round 1 | B.S. (Research) | ST | - | 616 |
| 2025 | Round 1 | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | General-PwD | - | 37 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | Round 1 | B.Tech | General | - | 856 |
| 2025 | Round 1 | B.Tech | OBC | - | 446 |
| 2025 | Round 1 | B.Tech | SC | - | 265 |
| 2025 | Round 1 | B.Tech | ST | - | 257 |
| 2025 | Round 1 | B.Tech | EWS | - | 130 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General-PwD | - | 40 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | General-PwD | - | 37 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General-PwD | - | 40 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | Round 1 | B.Tech | General | - | 856 |
| 2025 | Round 1 | B.Tech | OBC | - | 446 |
| 2025 | Round 1 | B.Tech | SC | - | 265 |
| 2025 | Round 1 | B.Tech | ST | - | 257 |
| 2025 | Round 1 | B.Tech | EWS | - | 130 |
| 2025 | Round 1 | B.Tech | General-PwD | - | 37 |
| 2025 | Round 1 | B.S. (Research) | General | - | 2,263 |
| 2025 | Round 1 | B.S. (Research) | OBC | - | 3,073 |
| 2025 | Round 1 | B.S. (Research) | SC | - | 770 |
| 2025 | Round 1 | B.S. (Research) | ST | - | 616 |
| 2025 | Round 1 | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | Round 1 | B.S. (Research) | General | - | 2,263 |
| 2025 | Round 1 | B.S. (Research) | OBC | - | 3,073 |
| 2025 | Round 1 | B.S. (Research) | SC | - | 770 |
| 2025 | Round 1 | B.S. (Research) | ST | - | 616 |
| 2025 | Round 1 | B.S. (Research) | EWS | - | 978 |
| 2025 | Round 1 | B.Tech | General | - | 856 |
| 2025 | Round 1 | B.Tech | OBC | - | 446 |
| 2025 | Round 1 | B.Tech | SC | - | 265 |
| 2025 | Round 1 | B.Tech | ST | - | 257 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General-PwD | - | 40 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | Round 1 | B.Tech | General | - | 856 |
| 2025 | Round 1 | B.Tech | OBC | - | 446 |
| 2025 | Round 1 | B.Tech | SC | - | 265 |
| 2025 | Round 1 | B.Tech | ST | - | 257 |
| 2025 | Round 1 | B.Tech | EWS | - | 130 |
| 2025 | Round 1 | B.S. (Research) | General | - | 2,263 |
| 2025 | Round 1 | B.S. (Research) | OBC | - | 3,073 |
| 2025 | Round 1 | B.S. (Research) | SC | - | 770 |
| 2025 | Round 1 | B.S. (Research) | ST | - | 616 |
| 2025 | Round 1 | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | Round 1 | B.Tech | General | - | 856 |
| 2025 | Round 1 | B.Tech | OBC | - | 446 |
| 2025 | Round 1 | B.Tech | SC | - | 265 |
| 2025 | Round 1 | B.Tech | ST | - | 257 |
| 2025 | Round 1 | B.Tech | EWS | - | 130 |
| 2025 | Round 1 | B.S. (Research) | General | - | 2,263 |
| 2025 | Round 1 | B.S. (Research) | OBC | - | 3,073 |
| 2025 | Round 1 | B.S. (Research) | SC | - | 770 |
| 2025 | Round 1 | B.S. (Research) | ST | - | 616 |
| 2025 | Round 1 | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | General-PwD | - | 37 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | General-PwD | - | 37 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | Round 1 | B.Tech | General | - | 856 |
| 2025 | Round 1 | B.S. (Research) | General | - | 3,073 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General-PwD | - | 40 |
| 2025 | Round 1 | B.Tech | General | - | 856 |
| 2025 | Round 1 | B.Tech | EWS | - | 130 |
| 2025 | Round 1 | B.Tech | OBC | - | 446 |
| 2025 | Round 1 | B.Tech | SC | - | 265 |
| 2025 | Round 1 | B.Tech | ST | - | 257 |
| 2025 | Round 1 | B.Tech | General-PwD | - | 37 |
| 2025 | Round 1 | B.S. (Research) | General | - | 2,263 |
| 2025 | Round 1 | B.S. (Research) | OBC | - | 3,073 |
| 2025 | Round 1 | B.S. (Research) | SC | - | 770 |
| 2025 | Round 1 | B.S. (Research) | ST | - | 616 |
| 2025 | Round 1 | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | General-PwD | - | 37 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General-PwD | - | 40 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | General-PwD | - | 37 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | Round 1 | B.Tech | General | - | 856 |
| 2025 | Round 1 | B.Tech | OBC | - | 446 |
| 2025 | Round 1 | B.Tech | SC | - | 265 |
| 2025 | Round 1 | B.Tech | ST | - | 257 |
| 2025 | Round 1 | B.Tech | EWS | - | 130 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | Round 1 | B.Tech | General | - | 856 |
| 2025 | Round 1 | B.Tech | EWS | - | 130 |
| 2025 | Round 1 | B.Tech | OBC | - | 446 |
| 2025 | Round 1 | B.Tech | SC | - | 265 |
| 2025 | Round 1 | B.Tech | ST | - | 257 |
| 2025 | Round 1 | B.Tech | General-PwD | - | 37 |
| 2025 | Round 1 | B.S. (Research) | General | - | 3,073 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | Round 1 | B.Tech | General | - | 856 |
| 2025 | Round 1 | B.Tech | OBC | - | 446 |
| 2025 | Round 1 | B.Tech | SC | - | 265 |
| 2025 | Round 1 | B.Tech | ST | - | 257 |
| 2025 | Round 1 | B.Tech | EWS | - | 130 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.Tech | General | 37 | 856 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General-PwD | - | 40 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | Round 1 | B.Tech | General | - | 856 |
| 2025 | Round 1 | B.Tech | OBC | - | 446 |
| 2025 | Round 1 | B.Tech | SC | - | 265 |
| 2025 | Round 1 | B.Tech | ST | - | 257 |
| 2025 | Round 1 | B.Tech | EWS | - | 130 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | Round 1 | B.Tech | General | - | 856 |
| 2025 | Round 1 | B.Tech | OBC | - | 446 |
| 2025 | Round 1 | B.Tech | SC | - | 265 |
| 2025 | Round 1 | B.Tech | ST | - | 257 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | Round 1 | B.S. (Research) | General | - | 2,263 |
| 2025 | Round 1 | B.S. (Research) | EWS | - | 978 |
| 2025 | Round 1 | B.S. (Research) | OBC | - | 3,073 |
| 2025 | Round 1 | B.S. (Research) | SC | - | 770 |
| 2025 | Round 1 | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | Round 1 | B.Tech | General | - | 856 |
| 2025 | Round 1 | B.Tech | EWS | - | 130 |
| 2025 | Round 1 | B.Tech | OBC | - | 446 |
| 2025 | Round 1 | B.Tech | SC | - | 265 |
| 2025 | Round 1 | B.Tech | ST | - | 257 |
| 2025 | Round 1 | B.S. (Research) | General | - | 2,263 |
| 2025 | Round 1 | B.S. (Research) | EWS | - | 978 |
| 2025 | Round 1 | B.S. (Research) | OBC | - | 3,073 |
| 2025 | Round 1 | B.S. (Research) | SC | - | 770 |
| 2025 | Round 1 | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | Round 1 | B.Tech | General | 856 | 856 |
| 2025 | Round 1 | B.Tech | EWS | 130 | 130 |
| 2025 | Round 1 | B.Tech | OBC | 446 | 446 |
| 2025 | Round 1 | B.Tech | SC | 265 | 265 |
| 2025 | Round 1 | B.Tech | ST | 257 | 257 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | General-PwD | - | 37 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | Round 1 | B.S. (Research) | General | - | 2,263 |
| 2025 | Round 1 | B.S. (Research) | EWS | - | 978 |
| 2025 | Round 1 | B.S. (Research) | OBC | - | 3,073 |
| 2025 | Round 1 | B.S. (Research) | SC | - | 770 |
| 2025 | Round 1 | B.S. (Research) | ST | - | 616 |
| 2025 | Round 1 | B.Tech | General | - | 856 |
| 2025 | Round 1 | B.Tech | EWS | - | 130 |
| 2025 | Round 1 | B.Tech | OBC | - | 446 |
| 2025 | Round 1 | B.Tech | SC | - | 265 |
| 2025 | Round 1 | B.Tech | ST | - | 257 |
| 2025 | Round 1 | B.S. (Research) | General | - | 2,263 |
| 2025 | Round 1 | B.S. (Research) | EWS | - | 978 |
| 2025 | Round 1 | B.S. (Research) | OBC | - | 3,073 |
| 2025 | Round 1 | B.S. (Research) | SC | - | 770 |
| 2025 | Round 1 | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | General-PwD | - | 37 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General-PwD | - | 40 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | Round 1 | B.Tech | General | - | 856 |
| 2025 | Round 1 | B.Tech | EWS | - | 130 |
| 2025 | Round 1 | B.Tech | OBC | - | 446 |
| 2025 | Round 1 | B.Tech | SC | - | 265 |
| 2025 | Round 1 | B.Tech | ST | - | 257 |
| 2025 | Round 1 | B.Tech | General-PwD | - | 37 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | General-PwD | - | 37 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | General-PwD | - | 37 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | Round 1 | B.Tech | General | - | 856 |
| 2025 | Round 1 | B.Tech | OBC | - | 446 |
| 2025 | Round 1 | B.Tech | SC | - | 265 |
| 2025 | Round 1 | B.Tech | ST | - | 257 |
| 2025 | Round 1 | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | General-PwD | - | 37 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General-PwD | - | 40 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | General-PwD | - | 37 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | Round 1 | B.Tech | General | - | 856 |
| 2025 | Round 1 | B.Tech | EWS | - | 130 |
| 2025 | Round 1 | B.Tech | OBC | - | 446 |
| 2025 | Round 1 | B.Tech | SC | - | 265 |
| 2025 | Round 1 | B.Tech | ST | - | 257 |
| 2025 | Round 1 | B.Tech | General-PwD | - | 37 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | General-PwD | - | 37 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | Round 1 | B.S. (Research) | General | - | 2,263 |
| 2025 | Round 1 | B.S. (Research) | OBC | - | 3,073 |
| 2025 | Round 1 | B.S. (Research) | SC | - | 770 |
| 2025 | Round 1 | B.S. (Research) | ST | - | 616 |
| 2025 | Round 1 | B.S. (Research) | EWS | - | 978 |
| 2025 | Round 1 | B.Tech | General | - | 856 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | Round 1 | B.Tech | General | - | 856 |
| 2025 | Round 1 | B.Tech | OBC | - | 446 |
| 2025 | Round 1 | B.Tech | SC | - | 265 |
| 2025 | Round 1 | B.Tech | ST | - | 257 |
| 2025 | Round 1 | B.Tech | EWS | - | 130 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General-PwD | - | 40 |
| 2025 | Round 1 | B.Tech | General | - | 856 |
| 2025 | Round 1 | B.Tech | OBC | - | 446 |
| 2025 | Round 1 | B.Tech | SC | - | 265 |
| 2025 | Round 1 | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | Round 1 | B.Tech | General | - | 856 |
| 2025 | Round 1 | B.Tech | OBC | - | 446 |
| 2025 | Round 1 | B.Tech | SC | - | 265 |
| 2025 | Round 1 | B.Tech | ST | - | 257 |
| 2025 | Round 1 | B.Tech | EWS | - | 130 |
| 2025 | Round 1 | B.S. (Research) | General | - | 2,263 |
| 2025 | Round 1 | B.S. (Research) | OBC | - | 3,073 |
| 2025 | Round 1 | B.S. (Research) | SC | - | 770 |
| 2025 | Round 1 | B.S. (Research) | ST | - | 616 |
| 2025 | Round 1 | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.Tech | General | - | 856 |
| 2025 | - | B.Tech | OBC | - | 446 |
| 2025 | - | B.Tech | SC | - | 265 |
| 2025 | - | B.Tech | ST | - | 257 |
| 2025 | - | B.Tech | EWS | - | 130 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | Round 1 | B.Tech | General | - | 856 |
| 2025 | Round 1 | B.Tech | EWS | - | 130 |
| 2025 | Round 1 | B.Tech | OBC | - | 446 |
| 2025 | Round 1 | B.Tech | SC | - | 265 |
| 2025 | Round 1 | B.Tech | ST | - | 257 |
| 2025 | Round 1 | B.Tech | General-PwD | - | 37 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | General-PwD | - | 40 |
| 2025 | - | B.S. (Research) | General | - | 2,263 |
| 2025 | - | B.S. (Research) | OBC | - | 3,073 |
| 2025 | - | B.S. (Research) | SC | - | 770 |
| 2025 | - | B.S. (Research) | ST | - | 616 |
| 2025 | - | B.S. (Research) | EWS | - | 978 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.Tech | General | - | 708 |
| 2024 | - | B.Tech | EWS | - | 276 |
| 2024 | - | B.Tech | OBC | - | 634 |
| 2024 | - | B.Tech | SC | - | 184 |
| 2024 | - | B.Tech | ST | - | 199 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.Tech | General | - | 708 |
| 2024 | - | B.Tech | OBC | - | 634 |
| 2024 | - | B.Tech | SC | - | 184 |
| 2024 | - | B.Tech | ST | - | 199 |
| 2024 | - | B.Tech | EWS | - | 276 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.Tech | General | - | 410 |
| 2024 | - | B.Tech | EWS | - | 2,322 |
| 2024 | - | B.Tech | OBC | - | 3,491 |
| 2024 | - | B.Tech | SC | - | 10,594 |
| 2024 | - | B.Tech | ST | - | 28,806 |
| 2024 | - | B.Tech | General | - | 410 |
| 2024 | - | B.Tech | EWS | - | 2,322 |
| 2024 | - | B.Tech | OBC | - | 3,491 |
| 2024 | - | B.Tech | SC | - | 10,594 |
| 2024 | - | B.Tech | ST | - | 28,806 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General-PwD | - | 19 |
| 2024 | - | B.Tech | General | - | 708 |
| 2024 | - | B.Tech | EWS | - | 276 |
| 2024 | - | B.Tech | OBC | - | 634 |
| 2024 | - | B.Tech | SC | - | 184 |
| 2024 | - | B.Tech | ST | - | 199 |
| 2024 | - | B.Tech | General-PwD | - | 19 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General-PwD | - | 19 |
| 2024 | - | B.Tech | General | - | 708 |
| 2024 | - | B.Tech | EWS | - | 276 |
| 2024 | - | B.Tech | OBC | - | 634 |
| 2024 | - | B.Tech | SC | - | 184 |
| 2024 | - | B.Tech | ST | - | 199 |
| 2024 | - | B.Tech | General-PwD | - | 19 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General-PwD | - | 19 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General-PwD | - | 19 |
| 2024 | - | B.Tech | General | - | 708 |
| 2024 | - | B.Tech | EWS | - | 276 |
| 2024 | - | B.Tech | OBC | - | 634 |
| 2024 | - | B.Tech | SC | - | 184 |
| 2024 | - | B.Tech | ST | - | 199 |
| 2024 | - | B.Tech | General-PwD | - | 19 |
| 2024 | Round 1 | B.S. (Research) | General | - | 1,095 |
| 2024 | Round 1 | B.S. (Research) | EWS | - | 829 |
| 2024 | Round 1 | B.S. (Research) | OBC | - | 2,348 |
| 2024 | Round 1 | B.S. (Research) | SC | - | 484 |
| 2024 | Round 1 | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.Tech | General | - | 708 |
| 2024 | - | B.Tech | EWS | - | 276 |
| 2024 | - | B.Tech | OBC | - | 634 |
| 2024 | - | B.Tech | SC | - | 184 |
| 2024 | - | B.Tech | ST | - | 199 |
| 2024 | - | B.Tech | General-PwD | - | 19 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General-PwD | - | 19 |
| 2024 | - | B.Tech | General | - | 708 |
| 2024 | - | B.Tech | EWS | - | 276 |
| 2024 | - | B.Tech | OBC | - | 634 |
| 2024 | - | B.Tech | SC | - | 184 |
| 2024 | - | B.Tech | ST | - | 199 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | General-PwD | - | 19 |
| 2024 | - | B.Tech | General | - | 708 |
| 2024 | - | B.Tech | OBC | - | 634 |
| 2024 | - | B.Tech | SC | - | 184 |
| 2024 | - | B.Tech | ST | - | 199 |
| 2024 | - | B.Tech | EWS | - | 276 |
| 2024 | - | B.Tech | General-PwD | - | 19 |
| 2024 | - | B.Tech | General | - | 708 |
| 2024 | - | B.Tech | EWS | - | 276 |
| 2024 | - | B.Tech | OBC | - | 634 |
| 2024 | - | B.Tech | SC | - | 184 |
| 2024 | - | B.Tech | ST | - | 199 |
| 2024 | - | B.Tech | General-PwD | - | 19 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General-PwD | - | 19 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | General-PwD | - | 19 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General-PwD | - | 19 |
| 2024 | - | B.Tech | General | - | 410 |
| 2024 | - | B.Tech | EWS | - | 2,322 |
| 2024 | - | B.Tech | OBC | - | 3,491 |
| 2024 | - | B.Tech | SC | - | 10,594 |
| 2024 | - | B.Tech | ST | - | 28,806 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General-PwD | - | 19 |
| 2024 | - | B.Tech | General | - | 708 |
| 2024 | - | B.Tech | EWS | - | 276 |
| 2024 | - | B.Tech | OBC | - | 634 |
| 2024 | - | B.Tech | SC | - | 184 |
| 2024 | - | B.Tech | ST | - | 199 |
| 2024 | - | B.Tech | General-PwD | - | 19 |
| 2024 | Round 1 | B.S. (Research) | General | - | 410 |
| 2024 | Round 1 | B.S. (Research) | EWS | - | 2,322 |
| 2024 | Round 1 | B.S. (Research) | OBC | - | 3,491 |
| 2024 | Round 1 | B.S. (Research) | SC | - | 10,594 |
| 2024 | Round 1 | B.S. (Research) | ST | - | 28,806 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | Round 1 | B.S. (Research) | General | - | 1,095 |
| 2024 | Round 1 | B.S. (Research) | OBC | - | 2,348 |
| 2024 | Round 1 | B.S. (Research) | SC | - | 484 |
| 2024 | Round 1 | B.S. (Research) | ST | - | 190 |
| 2024 | Round 1 | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.Tech | General | - | 708 |
| 2024 | - | B.S. (Research) | General | - | 2,348 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.Tech | General | - | 708 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General-PwD | - | 19 |
| 2024 | - | B.Tech | General | - | 708 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.Tech | General | - | 708 |
| 2024 | - | B.Tech | OBC | - | 634 |
| 2024 | - | B.Tech | SC | - | 184 |
| 2024 | - | B.Tech | ST | - | 199 |
| 2024 | - | B.Tech | General | - | 410 |
| 2024 | - | B.Tech | EWS | - | 2,322 |
| 2024 | - | B.Tech | OBC | - | 3,491 |
| 2024 | - | B.Tech | SC | - | 10,594 |
| 2024 | - | B.Tech | ST | - | 28,806 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 2,322 |
| 2024 | - | B.S. (Research) | OBC | - | 3,491 |
| 2024 | - | B.S. (Research) | SC | - | 10,594 |
| 2024 | - | B.S. (Research) | ST | - | 28,806 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General-PwD | - | 19 |
| 2024 | - | B.Tech | General | - | 410 |
| 2024 | - | B.Tech | OBC | - | 3,491 |
| 2024 | - | B.Tech | SC | - | 10,594 |
| 2024 | - | B.Tech | ST | - | 28,806 |
| 2024 | - | B.Tech | EWS | - | 2,322 |
| 2024 | Round 1 | B.Tech | General | - | 410 |
| 2024 | Round 1 | B.Tech | OBC | - | 3,491 |
| 2024 | Round 1 | B.Tech | SC | - | 10,594 |
| 2024 | Round 1 | B.Tech | ST | - | 28,806 |
| 2024 | Round 1 | B.Tech | EWS | - | 2,322 |
| 2024 | Round 1 | B.S. (Research) | General | - | 1,095 |
| 2024 | Round 1 | B.S. (Research) | OBC | - | 2,348 |
| 2024 | Round 1 | B.S. (Research) | SC | - | 484 |
| 2024 | Round 1 | B.S. (Research) | ST | - | 190 |
| 2024 | Round 1 | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.Tech | General | - | 708 |
| 2024 | - | B.Tech | OBC | - | 634 |
| 2024 | - | B.Tech | SC | - | 184 |
| 2024 | - | B.Tech | ST | - | 199 |
| 2024 | Round 1 | B.S. (Research) | General | - | 1,095 |
| 2024 | Round 1 | B.S. (Research) | OBC | - | 2,348 |
| 2024 | Round 1 | B.S. (Research) | SC | - | 484 |
| 2024 | Round 1 | B.S. (Research) | ST | - | 190 |
| 2024 | Round 1 | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | General | - | 410 |
| 2024 | - | B.S. (Research) | OBC | - | 3,491 |
| 2024 | - | B.S. (Research) | SC | - | 10,594 |
| 2024 | - | B.S. (Research) | General | - | 410 |
| 2024 | - | B.S. (Research) | EWS | - | 2,322 |
| 2024 | - | B.S. (Research) | OBC | - | 3,491 |
| 2024 | - | B.S. (Research) | SC | - | 10,594 |
| 2024 | - | B.S. (Research) | ST | - | 28,806 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | Round 1 | B.Tech | General | - | 708 |
| 2024 | Round 1 | B.S. (Research) | General | - | 1,095 |
| 2024 | Round 1 | B.S. (Research) | OBC | - | 2,348 |
| 2024 | Round 1 | B.S. (Research) | SC | - | 484 |
| 2024 | Round 1 | B.S. (Research) | ST | - | 190 |
| 2024 | Round 1 | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | General | - | 410 |
| 2024 | - | B.S. (Research) | EWS | - | 2,322 |
| 2024 | - | B.S. (Research) | OBC | - | 3,491 |
| 2024 | - | B.S. (Research) | SC | - | 10,594 |
| 2024 | - | B.S. (Research) | ST | - | 28,806 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.Tech | General | - | 708 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | General | - | 410 |
| 2024 | - | B.S. (Research) | EWS | - | 2,322 |
| 2024 | - | B.S. (Research) | OBC | - | 3,491 |
| 2024 | - | B.S. (Research) | SC | - | 10,594 |
| 2024 | - | B.S. (Research) | ST | - | 28,806 |
| 2024 | - | B.Tech | General | - | 708 |
| 2024 | - | B.Tech | OBC | - | 634 |
| 2024 | - | B.Tech | SC | - | 184 |
| 2024 | - | B.Tech | ST | - | 199 |
| 2024 | - | B.Tech | EWS | - | 276 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.Tech | General | - | 708 |
| 2024 | - | B.S. (Research) | General | - | 2,348 |
| 2024 | - | B.S. (Research) | EWS | - | 2,322 |
| 2024 | - | B.S. (Research) | OBC | - | 3,491 |
| 2024 | - | B.S. (Research) | SC | - | 10,594 |
| 2024 | - | B.S. (Research) | ST | - | 28,806 |
| 2024 | - | B.Tech | General | - | 708 |
| 2024 | Round 1 | B.S. (Research) | General | - | 1,095 |
| 2024 | Round 1 | B.S. (Research) | OBC | - | 2,348 |
| 2024 | Round 1 | B.S. (Research) | SC | - | 484 |
| 2024 | Round 1 | B.S. (Research) | ST | - | 190 |
| 2024 | Round 1 | B.S. (Research) | EWS | - | 829 |
| 2024 | Round 1 | B.Tech | General | - | 410 |
| 2024 | Round 1 | B.Tech | OBC | - | 3,491 |
| 2024 | Round 1 | B.Tech | SC | - | 10,594 |
| 2024 | Round 1 | B.Tech | ST | - | 28,806 |
| 2024 | Round 1 | B.Tech | EWS | - | 2,322 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | Round 1 | B.Tech | General | - | 708 |
| 2024 | Round 1 | B.S. (Research) | General | - | 1,095 |
| 2024 | Round 1 | B.S. (Research) | OBC | - | 2,348 |
| 2024 | Round 1 | B.S. (Research) | SC | - | 484 |
| 2024 | Round 1 | B.S. (Research) | ST | - | 190 |
| 2024 | Round 1 | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.Tech | General | - | 708 |
| 2024 | - | B.Tech | EWS | - | 276 |
| 2024 | - | B.Tech | OBC | - | 634 |
| 2024 | - | B.Tech | SC | - | 184 |
| 2024 | - | B.Tech | ST | - | 199 |
| 2024 | - | B.Tech | General-PwD | - | 19 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | Round 1 | B.Tech | General | - | 410 |
| 2024 | Round 1 | B.Tech | EWS | - | 2,322 |
| 2024 | Round 1 | B.Tech | OBC | - | 3,491 |
| 2024 | Round 1 | B.Tech | SC | - | 10,594 |
| 2024 | Round 1 | B.Tech | ST | - | 28,806 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.Tech | General | - | 410 |
| 2024 | - | B.Tech | OBC | - | 3,491 |
| 2024 | - | B.Tech | EWS | - | 2,322 |
| 2024 | - | B.Tech | SC | - | 10,594 |
| 2024 | - | B.Tech | ST | - | 28,806 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.Tech | General | - | 410 |
| 2024 | - | B.Tech | EWS | - | 2,322 |
| 2024 | - | B.Tech | OBC | - | 3,491 |
| 2024 | - | B.Tech | SC | - | 10,594 |
| 2024 | - | B.Tech | ST | - | 28,806 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | Round 1 | B.Tech | General | - | 708 |
| 2024 | Round 1 | B.S. (Research) | General | - | 1,095 |
| 2024 | Round 1 | B.S. (Research) | EWS | - | 829 |
| 2024 | Round 1 | B.S. (Research) | OBC | - | 2,348 |
| 2024 | Round 1 | B.S. (Research) | SC | - | 484 |
| 2024 | Round 1 | B.S. (Research) | ST | - | 190 |
| 2024 | Round 1 | B.S. (Research) | General-PwD | - | 19 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | General | - | 410 |
| 2024 | - | B.S. (Research) | EWS | - | 2,322 |
| 2024 | - | B.S. (Research) | OBC | - | 3,491 |
| 2024 | - | B.S. (Research) | SC | - | 10,594 |
| 2024 | - | B.S. (Research) | ST | - | 28,806 |
| 2024 | Round 1 | B.S. (Research) | General | - | 410 |
| 2024 | Round 1 | B.S. (Research) | EWS | - | 2,322 |
| 2024 | Round 1 | B.S. (Research) | OBC | - | 3,491 |
| 2024 | Round 1 | B.S. (Research) | SC | - | 10,594 |
| 2024 | Round 1 | B.S. (Research) | ST | - | 28,806 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.Tech | General | - | 708 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.Tech | General | 410 | 708 |
| 2024 | - | B.Tech | EWS | 2,322 | - |
| 2024 | - | B.Tech | OBC | 3,491 | - |
| 2024 | - | B.Tech | SC | 10,594 | - |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.Tech | General | - | 708 |
| 2024 | - | B.Tech | EWS | - | 276 |
| 2024 | - | B.Tech | OBC | - | 634 |
| 2024 | - | B.Tech | SC | - | 184 |
| 2024 | - | B.Tech | ST | - | 199 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.Tech | General | - | 708 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | General | - | 410 |
| 2024 | - | B.S. (Research) | EWS | - | 2,322 |
| 2024 | - | B.S. (Research) | OBC | - | 3,491 |
| 2024 | - | B.S. (Research) | SC | - | 10,594 |
| 2024 | - | B.S. (Research) | ST | - | 28,806 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.Tech | General | - | 708 |
| 2024 | - | B.Tech | OBC | - | 634 |
| 2024 | - | B.Tech | SC | - | 184 |
| 2024 | - | B.Tech | ST | - | 199 |
| 2024 | - | B.Tech | General | - | 410 |
| 2024 | - | B.Tech | EWS | - | 2,322 |
| 2024 | - | B.Tech | OBC | - | 3,491 |
| 2024 | - | B.Tech | SC | - | 10,594 |
| 2024 | - | B.Tech | ST | - | 28,806 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | Round 1 | B.S. (Research) | General | - | 1,095 |
| 2024 | Round 1 | B.S. (Research) | EWS | - | 829 |
| 2024 | Round 1 | B.S. (Research) | OBC | - | 2,348 |
| 2024 | Round 1 | B.S. (Research) | SC | - | 484 |
| 2024 | Round 1 | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.Tech | General | - | 708 |
| 2024 | - | B.Tech | OBC | - | 634 |
| 2024 | - | B.Tech | SC | - | 184 |
| 2024 | - | B.Tech | ST | - | 199 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.Tech | General | - | 410 |
| 2024 | - | B.Tech | EWS | - | 2,322 |
| 2024 | - | B.Tech | OBC | - | 3,491 |
| 2024 | - | B.Tech | SC | - | 10,594 |
| 2024 | - | B.Tech | ST | - | 28,806 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.Tech | General | - | 708 |
| 2024 | - | B.S. (Research) | General | - | 410 |
| 2024 | - | B.S. (Research) | OBC | - | 3,491 |
| 2024 | - | B.S. (Research) | SC | - | 10,594 |
| 2024 | - | B.S. (Research) | ST | - | 28,806 |
| 2024 | - | B.S. (Research) | EWS | - | 2,322 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | Round 1 | B.S. (Research) | General | - | 1,095 |
| 2024 | Round 1 | B.S. (Research) | EWS | - | 829 |
| 2024 | Round 1 | B.S. (Research) | OBC | - | 2,348 |
| 2024 | Round 1 | B.S. (Research) | SC | - | 484 |
| 2024 | Round 1 | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.Tech | General | - | 708 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | Round 1 | B.Tech | General | 410 | 410 |
| 2024 | Round 1 | B.Tech | EWS | 2,322 | 2,322 |
| 2024 | Round 1 | B.Tech | OBC | 3,491 | 3,491 |
| 2024 | Round 1 | B.Tech | SC | 10,594 | 10,594 |
| 2024 | Round 1 | B.Tech | ST | 28,806 | 28,806 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.Tech | General | - | 708 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.Tech | General | - | 708 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | Round 1 | B.Tech | General | - | 410 |
| 2024 | Round 1 | B.Tech | EWS | - | 2,322 |
| 2024 | Round 1 | B.Tech | OBC | - | 3,491 |
| 2024 | Round 1 | B.Tech | SC | - | 10,594 |
| 2024 | Round 1 | B.Tech | ST | - | 28,806 |
| 2024 | Round 1 | B.Tech | General-PwD | - | 28,978 |
| 2024 | Round 1 | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.Tech | General | - | 708 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | General-PwD | - | 19 |
| 2024 | Round 1 | B.S. (Research) | General | - | 1,095 |
| 2024 | Round 1 | B.S. (Research) | EWS | - | 829 |
| 2024 | Round 1 | B.S. (Research) | OBC | - | 2,348 |
| 2024 | Round 1 | B.S. (Research) | SC | - | 484 |
| 2024 | Round 1 | B.S. (Research) | ST | - | 190 |
| 2024 | Round 1 | B.Tech | General | - | 410 |
| 2024 | Round 1 | B.Tech | EWS | - | 2,322 |
| 2024 | Round 1 | B.Tech | OBC | - | 3,491 |
| 2024 | Round 1 | B.Tech | SC | - | 10,594 |
| 2024 | Round 1 | B.Tech | ST | - | 28,806 |
| 2024 | Round 1 | B.S. (Research) | General | - | 1,095 |
| 2024 | Round 1 | B.S. (Research) | EWS | - | 829 |
| 2024 | Round 1 | B.S. (Research) | OBC | - | 2,348 |
| 2024 | Round 1 | B.S. (Research) | SC | - | 484 |
| 2024 | Round 1 | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 410 |
| 2024 | - | B.S. (Research) | OBC | - | 3,491 |
| 2024 | - | B.S. (Research) | SC | - | 10,594 |
| 2024 | - | B.S. (Research) | ST | - | 28,806 |
| 2024 | - | B.S. (Research) | EWS | - | 2,322 |
| 2024 | - | B.S. (Research) | General-PwD | - | 28,978 |
| 2024 | - | B.Tech | General | - | 708 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 2,322 |
| 2024 | - | B.S. (Research) | OBC | - | 3,491 |
| 2024 | - | B.S. (Research) | SC | - | 10,594 |
| 2024 | - | B.S. (Research) | ST | - | 28,806 |
| 2024 | Round 1 | B.Tech | General | - | 410 |
| 2024 | Round 1 | B.Tech | EWS | - | 2,322 |
| 2024 | Round 1 | B.Tech | OBC | - | 3,491 |
| 2024 | Round 1 | B.Tech | SC | - | 10,594 |
| 2024 | Round 1 | B.Tech | ST | - | 28,806 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.Tech | General | - | 708 |
| 2024 | - | B.Tech | EWS | - | 276 |
| 2024 | - | B.Tech | OBC | - | 634 |
| 2024 | - | B.Tech | SC | - | 184 |
| 2024 | - | B.Tech | ST | - | 199 |
| 2024 | - | B.Tech | General-PwD | - | 19 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | General | - | 903 |
| 2024 | - | B.S. (Research) | OBC | - | 1,665 |
| 2024 | - | B.S. (Research) | SC | - | 581 |
| 2024 | - | B.S. (Research) | ST | - | 314 |
| 2024 | Round 1 | B.S. (Research) | General | - | 410 |
| 2024 | Round 1 | B.S. (Research) | EWS | - | 2,322 |
| 2024 | Round 1 | B.S. (Research) | OBC | - | 3,491 |
| 2024 | Round 1 | B.S. (Research) | SC | - | 10,594 |
| 2024 | Round 1 | B.S. (Research) | ST | - | 28,806 |
| 2024 | - | B.Tech | General | - | 708 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General-PwD | - | 19 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.Tech | General | - | 708 |
| 2024 | - | B.S. (Research) | General | - | 410 |
| 2024 | - | B.S. (Research) | EWS | - | 2,322 |
| 2024 | - | B.S. (Research) | OBC | - | 3,491 |
| 2024 | - | B.S. (Research) | SC | - | 10,594 |
| 2024 | - | B.S. (Research) | ST | - | 28,806 |
| 2024 | Round 1 | B.S. (Research) | General | - | 1,095 |
| 2024 | Round 1 | B.S. (Research) | OBC | - | 2,348 |
| 2024 | Round 1 | B.S. (Research) | SC | - | 484 |
| 2024 | Round 1 | B.S. (Research) | ST | - | 190 |
| 2024 | Round 1 | B.S. (Research) | EWS | - | 829 |
| 2024 | Round 1 | B.Tech | General | - | 708 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | General-PwD | - | 19 |
| 2024 | - | B.S. (Research) | General | - | 410 |
| 2024 | - | B.S. (Research) | EWS | - | 2,322 |
| 2024 | - | B.S. (Research) | OBC | - | 3,491 |
| 2024 | - | B.S. (Research) | SC | - | 10,594 |
| 2024 | - | B.S. (Research) | ST | - | 28,806 |
| 2024 | - | B.S. (Research) | General-PwD | - | 28,978 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 410 |
| 2024 | - | B.S. (Research) | EWS | - | 2,322 |
| 2024 | - | B.S. (Research) | OBC | - | 3,491 |
| 2024 | - | B.S. (Research) | SC | - | 10,594 |
| 2024 | - | B.S. (Research) | ST | - | 28,806 |
| 2024 | - | B.Tech | General | - | 708 |
| 2024 | - | B.S. (Research) | General | - | 410 |
| 2024 | - | B.S. (Research) | OBC | - | 3,491 |
| 2024 | - | B.S. (Research) | SC | - | 10,594 |
| 2024 | - | B.S. (Research) | ST | - | 28,806 |
| 2024 | - | B.S. (Research) | EWS | - | 2,322 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | Round 1 | B.S. (Research) | General | - | 1,095 |
| 2024 | Round 1 | B.S. (Research) | OBC | - | 2,348 |
| 2024 | Round 1 | B.S. (Research) | SC | - | 484 |
| 2024 | Round 1 | B.S. (Research) | ST | - | 190 |
| 2024 | Round 1 | B.S. (Research) | EWS | - | 829 |
| 2024 | Round 1 | B.Tech | General | - | 708 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.Tech | General | - | 410 |
| 2024 | - | B.Tech | EWS | - | 2,322 |
| 2024 | - | B.Tech | OBC | - | 3,491 |
| 2024 | - | B.Tech | SC | - | 10,594 |
| 2024 | - | B.Tech | ST | - | 28,806 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | General | - | 1,095 |
| 2024 | - | B.S. (Research) | OBC | - | 2,348 |
| 2024 | - | B.S. (Research) | SC | - | 484 |
| 2024 | - | B.S. (Research) | ST | - | 190 |
| 2024 | - | B.S. (Research) | EWS | - | 829 |
| 2023 | - | B.Tech | General | - | 757 |
| 2023 | - | B.Tech | EWS | - | 351 |
| 2023 | - | B.Tech | OBC | - | 755 |
| 2023 | - | B.Tech | SC | - | 559 |
| 2023 | - | B.Tech | ST | - | 295 |
| 2023 | - | B.S. (Research) | General | - | 360 |
| 2023 | - | B.S. (Research) | EWS | - | 7,531 |
| 2023 | - | B.S. (Research) | OBC | - | 7,827 |
| 2023 | - | B.S. (Research) | SC | - | 20,558 |
| 2023 | - | B.S. (Research) | ST | - | 30,282 |
| 2023 | - | B.S. (Research) | General | - | 360 |
| 2023 | - | B.S. (Research) | EWS | - | 7,531 |
| 2023 | - | B.S. (Research) | OBC | - | 7,827 |
| 2023 | - | B.S. (Research) | SC | - | 20,558 |
| 2023 | - | B.S. (Research) | ST | - | 30,282 |
| 2023 | - | B.S. (Research) | General | - | 360 |
| 2023 | - | B.S. (Research) | OBC | - | 7,827 |
| 2023 | - | B.S. (Research) | SC | - | 20,558 |
| 2023 | - | B.S. (Research) | ST | - | 30,282 |
| 2023 | - | B.S. (Research) | EWS | - | 7,531 |
| 2023 | - | B.Tech | General | - | 757 |
| 2023 | - | B.S. (Research) | General | 360 | 757 |
| 2023 | - | B.S. (Research) | EWS | 351 | 7,531 |
| 2023 | - | B.S. (Research) | OBC | 755 | 7,827 |
| 2023 | - | B.S. (Research) | SC | 559 | 20,558 |
| 2023 | - | B.S. (Research) | ST | 295 | 30,282 |
| 2023 | - | B.S. (Research) | General | - | 360 |
| 2023 | - | B.S. (Research) | EWS | - | 7,531 |
| 2023 | - | B.S. (Research) | OBC | - | 7,827 |
| 2023 | - | B.S. (Research) | SC | - | 20,558 |
| 2023 | - | B.S. (Research) | ST | - | 30,282 |
| 2023 | - | B.Tech | General | - | 757 |
| 2023 | - | B.Tech | EWS | - | 351 |
| 2023 | - | B.Tech | OBC | - | 755 |
| 2023 | - | B.Tech | SC | - | 559 |
| 2023 | - | B.Tech | ST | - | 295 |
| 2023 | - | B.Tech | General-PwD | - | 35 |
| 2023 | - | B.S. (Research) | General | - | 360 |
| 2023 | - | B.S. (Research) | EWS | - | 7,531 |
| 2023 | - | B.S. (Research) | OBC | - | 7,827 |
| 2023 | - | B.S. (Research) | SC | - | 20,558 |
| 2023 | - | B.S. (Research) | ST | - | 30,282 |
| 2023 | - | B.S. (Research) | General | - | 360 |
| 2023 | - | B.S. (Research) | OBC | - | 7,827 |
| 2023 | - | B.S. (Research) | SC | - | 20,558 |
| 2023 | - | B.S. (Research) | ST | - | 30,282 |
| 2023 | - | B.S. (Research) | EWS | - | 7,531 |
| 2023 | - | B.S. (Research) | General | - | 360 |
| 2023 | - | B.S. (Research) | OBC | - | 7,827 |
| 2023 | - | B.S. (Research) | SC | - | 20,558 |
| 2023 | - | B.S. (Research) | ST | - | 30,282 |
| 2023 | - | B.S. (Research) | EWS | - | 7,531 |
| 2023 | Round 1 | B.S. (Research) | General | - | 360 |
| 2023 | Round 1 | B.S. (Research) | EWS | - | 7,531 |
| 2023 | Round 1 | B.S. (Research) | OBC | - | 7,827 |
| 2023 | Round 1 | B.S. (Research) | SC | - | 20,558 |
| 2023 | Round 1 | B.S. (Research) | ST | - | 30,282 |
| 2023 | - | B.Tech | General | - | 757 |
| 2023 | - | B.Tech | EWS | - | 351 |
| 2023 | - | B.Tech | OBC | - | 755 |
| 2023 | - | B.Tech | SC | - | 559 |
| 2023 | - | B.Tech | ST | - | 295 |
| 2023 | - | B.S. (Research) | General | - | 757 |
| 2023 | - | B.S. (Research) | EWS | - | 351 |
| 2023 | - | B.S. (Research) | OBC | - | 755 |
| 2023 | - | B.S. (Research) | SC | - | 559 |
| 2023 | - | B.S. (Research) | ST | - | 295 |
| 2023 | - | B.S. (Research) | General | - | 360 |
| 2023 | - | B.S. (Research) | OBC | - | 7,827 |
| 2023 | - | B.S. (Research) | EWS | - | 7,531 |
| 2023 | - | B.S. (Research) | SC | - | 20,558 |
| 2023 | - | B.S. (Research) | ST | - | 30,282 |
| 2023 | - | B.S. (Research) | General | - | 360 |
| 2023 | - | B.S. (Research) | OBC | - | 7,827 |
| 2023 | - | B.S. (Research) | SC | - | 20,558 |
| 2023 | - | B.S. (Research) | ST | - | 30,282 |
| 2023 | - | B.S. (Research) | EWS | - | 7,531 |
| 2023 | - | B.S. (Research) | General | - | 360 |
| 2023 | - | B.S. (Research) | OBC | - | 7,827 |
| 2023 | - | B.S. (Research) | SC | - | 20,558 |
| 2023 | - | B.S. (Research) | ST | - | 30,282 |
| 2023 | - | B.S. (Research) | EWS | - | 7,531 |
| 2023 | Round 1 | B.Tech | General | - | 757 |
| 2022 | - | B.Tech | General | - | 718 |
| 2022 | - | B.Tech | EWS | - | 3,400 |
| 2022 | - | B.Tech | OBC | - | 4,881 |
| 2022 | - | B.Tech | SC | - | 12,332 |
| 2022 | - | B.Tech | ST | - | 28,806 |
IISc Bangalore JEE Main Cutoff (2025, 2024, 2023, 2022)
| Year | Branch / Programme | Category | Opening Rank | Closing Rank |
|---|---|---|---|---|
| 2025 | - | General | - | 903 |
| 2025 | - | OBC | - | 1,665 |
| 2025 | - | SC | - | 581 |
| 2025 | - | ST | - | 314 |
| 2025 | - | EWS | - | 1,214 |
| 2025 | - | General | - | 903 |
| 2025 | - | OBC | - | 1,665 |
| 2025 | - | SC | - | 581 |
| 2025 | - | ST | - | 314 |
| 2025 | - | EWS | - | 1,214 |
| 2024 | - | General | - | 903 |
| 2024 | - | EWS | - | 1,214 |
| 2024 | - | OBC | - | 1,665 |
| 2024 | - | SC | - | 581 |
| 2024 | - | ST | - | 314 |
| 2024 | - | General | - | 903 |
| 2024 | - | EWS | - | 1,214 |
| 2024 | - | OBC | - | 1,665 |
| 2024 | - | SC | - | 581 |
| 2024 | - | ST | - | 314 |
| 2024 | - | General | - | 903 |
| 2024 | - | OBC | - | 1,665 |
| 2024 | - | SC | - | 581 |
| 2024 | - | ST | - | 314 |
| 2024 | - | EWS | - | 1,214 |
| 2024 | - | General | - | 903 |
| 2024 | - | EWS | - | 1,214 |
| 2024 | - | OBC | - | 1,665 |
| 2024 | - | SC | - | 581 |
| 2024 | - | ST | - | 314 |
| 2024 | - | General-PwD | - | 4 |
| 2024 | - | General | - | 903 |
| 2024 | - | EWS | - | 1,214 |
| 2024 | - | OBC | - | 1,665 |
| 2024 | - | SC | - | 581 |
| 2024 | - | ST | - | 314 |
| 2024 | - | General | - | 903 |
| 2024 | - | EWS | - | 1,214 |
| 2024 | - | OBC | - | 1,665 |
| 2024 | - | SC | - | 581 |
| 2024 | - | ST | - | 314 |
| 2024 | - | General-PwD | - | 4 |
| 2024 | - | General | - | 903 |
| 2024 | - | EWS | - | 1,214 |
| 2024 | - | OBC | - | 1,665 |
| 2024 | - | SC | - | 581 |
| 2024 | - | ST | - | 314 |
| 2024 | - | General-PwD | - | 4 |
| 2024 | - | General | - | 903 |
| 2024 | - | EWS | - | 1,214 |
| 2024 | - | OBC | - | 1,665 |
| 2024 | - | SC | - | 581 |
| 2024 | - | ST | - | 314 |
| 2024 | - | General | - | 903 |
| 2024 | - | EWS | - | 1,214 |
| 2024 | - | OBC | - | 1,665 |
| 2024 | - | SC | - | 581 |
| 2024 | - | ST | - | 314 |
| 2024 | - | General | - | 903 |
| 2024 | - | OBC | - | 1,665 |
| 2024 | - | SC | - | 581 |
| 2024 | - | ST | - | 314 |
| 2024 | - | EWS | - | 1,214 |
| 2024 | - | General-PwD | - | 4 |
| 2024 | - | General | - | 903 |
| 2024 | - | EWS | - | 1,214 |
| 2024 | - | OBC | - | 1,665 |
| 2024 | - | SC | - | 581 |
| 2024 | - | ST | - | 314 |
| 2024 | - | General-PwD | - | 4 |
| 2024 | - | General | - | 903 |
| 2024 | - | EWS | - | 1,214 |
| 2024 | - | OBC | - | 1,665 |
| 2024 | - | SC | - | 581 |
| 2024 | - | ST | - | 314 |
| 2024 | - | General-PwD | - | 4 |
| 2024 | - | General | - | 903 |
| 2024 | - | EWS | - | 1,214 |
| 2024 | - | OBC | - | 1,665 |
| 2024 | - | SC | - | 581 |
| 2024 | - | ST | - | 314 |
| 2024 | - | General-PwD | - | 4 |
| 2024 | - | General | - | 903 |
| 2024 | - | EWS | - | 1,214 |
| 2024 | - | OBC | - | 1,665 |
| 2024 | - | SC | - | 581 |
| 2024 | - | ST | - | 314 |
| 2024 | Round 1 | General | - | 903 |
| 2024 | Round 1 | OBC | - | 1,665 |
| 2024 | Round 1 | SC | - | 581 |
| 2024 | Round 1 | ST | - | 314 |
| 2024 | - | General | - | 903 |
| 2024 | - | OBC | - | 1,665 |
| 2024 | - | SC | - | 581 |
| 2024 | - | ST | - | 314 |
| 2024 | - | General | - | 903 |
| 2024 | - | OBC | - | 1,665 |
| 2024 | - | SC | - | 581 |
| 2024 | - | ST | - | 314 |
| 2024 | - | EWS | - | 1,214 |
| 2024 | - | General | - | 903 |
| 2024 | - | EWS | - | 1,214 |
| 2024 | - | OBC | - | 1,665 |
| 2024 | - | SC | - | 581 |
| 2024 | - | ST | - | 314 |
| 2024 | - | General | - | 903 |
| 2024 | - | OBC | - | 1,665 |
| 2024 | - | SC | - | 581 |
| 2024 | - | ST | - | 314 |
| 2024 | - | General | - | 903 |
| 2024 | - | General | - | 903 |
| 2024 | - | General | - | 903 |
| 2024 | - | EWS | - | 1,214 |
| 2024 | - | OBC | - | 1,665 |
| 2024 | - | SC | - | 581 |
| 2024 | - | ST | - | 314 |
| 2024 | - | General | - | 903 |
| 2024 | Round 1 | General | - | 903 |
| 2024 | Round 1 | General | - | 903 |
| 2024 | Round 1 | EWS | - | 1,214 |
| 2024 | Round 1 | OBC | - | 1,665 |
| 2024 | Round 1 | SC | - | 581 |
| 2024 | Round 1 | ST | - | 314 |
| 2024 | - | General | - | 903 |
| 2024 | - | OBC | - | 1,665 |
| 2024 | - | EWS | - | 1,214 |
| 2024 | - | SC | - | 581 |
| 2024 | - | ST | - | 314 |
| 2024 | - | General | - | 903 |
| 2024 | - | OBC | - | 1,665 |
| 2024 | - | EWS | - | 1,214 |
| 2024 | - | SC | - | 581 |
| 2024 | - | ST | - | 314 |
| 2024 | - | General | - | 903 |
| 2024 | - | OBC | - | 1,665 |
| 2024 | - | General | - | 903 |
| 2024 | - | OBC | - | 1,665 |
| 2024 | - | EWS | - | 1,214 |
| 2024 | - | SC | - | 581 |
| 2024 | - | ST | - | 314 |
| 2024 | - | General | - | 903 |
| 2024 | - | EWS | - | 1,214 |
| 2024 | - | OBC | - | 1,665 |
| 2024 | - | SC | - | 581 |
| 2024 | - | ST | - | 314 |
| 2024 | - | General | - | 903 |
| 2024 | - | OBC | - | 1,665 |
| 2024 | - | SC | - | 581 |
| 2024 | - | ST | - | 314 |
| 2024 | - | General | - | 903 |
| 2024 | - | OBC | - | 1,665 |
| 2024 | Round 1 | General | - | 903 |
| 2024 | Round 1 | EWS | - | 1,214 |
| 2024 | Round 1 | OBC | - | 1,665 |
| 2024 | Round 1 | SC | - | 581 |
| 2024 | Round 1 | ST | - | 314 |
| 2024 | - | General | - | 903 |
| 2024 | - | OBC | - | 1,665 |
| 2024 | - | General | - | 903 |
| 2024 | - | OBC | - | 1,665 |
| 2024 | - | SC | - | 581 |
| 2024 | - | ST | - | 314 |
| 2024 | - | EWS | - | 1,214 |
| 2024 | - | General-PwD | - | 4 |
| 2024 | - | General | - | 903 |
| 2024 | - | EWS | - | 1,214 |
| 2024 | - | OBC | - | 1,665 |
| 2024 | - | SC | - | 581 |
| 2024 | - | ST | - | 314 |
| 2024 | - | General | - | 903 |
| 2024 | - | OBC | - | 1,665 |
| 2024 | - | SC | - | 581 |
| 2024 | - | ST | - | 314 |
| 2024 | Round 1 | General | - | 903 |
| 2024 | Round 1 | OBC | - | 1,665 |
| 2024 | Round 1 | SC | - | 581 |
| 2024 | Round 1 | ST | - | 314 |
| 2024 | - | General | - | 903 |
| 2024 | - | OBC | - | 1,665 |
| 2024 | - | SC | - | 581 |
| 2024 | - | ST | - | 314 |
| 2024 | - | EWS | - | 1,214 |
| 2024 | - | General | - | 903 |
| 2024 | - | OBC | - | 1,665 |
| 2024 | - | SC | - | 581 |
| 2024 | - | ST | - | 314 |
| 2023 | Round 1 | General | 47 | 398 |
| 2023 | Round 1 | OBC-NCL | 112 | 620 |
| 2023 | Round 1 | SC | 198 | 1,050 |
| 2023 | Round 1 | ST | 55 | 280 |
| 2023 | Round 1 | EWS | 180 | 520 |
| 2022 | Round 3 | General | - | 353 |
| 2022 | Round 3 | EWS | - | 17,555 |
| 2022 | Round 3 | OBC | - | 17,740 |
| 2022 | Round 3 | SC | - | 21,000 |
| 2022 | Round 3 | ST | - | 55,000 |
IISc Bangalore GATE Cutoff (2025, 2024, 2023)
| Year | Branch / Programme | Course | Category | Cutoff Score |
|---|---|---|---|---|
| 2025 | Round 1 | M.Tech | General | 903.00 |
| 2025 | Round 1 | M.Tech | OBC | 830.00 |
| 2025 | Round 1 | M.Tech | SC | 724.00 |
| 2025 | Round 1 | M.Tech | ST | 575.00 |
| 2025 | Round 1 | M.Tech | EWS | 843.00 |
| 2025 | Round 1 | M.Tech | General | 774.00 |
| 2025 | Round 1 | M.Tech | OBC | 706.00 |
| 2025 | Round 1 | M.Tech | SC | 497.00 |
| 2025 | Round 1 | M.Tech | ST | 338.00 |
| 2025 | Round 1 | M.Tech | EWS | 753.00 |
| 2025 | Round 1 | M.Tech | General | 634.00 |
| 2025 | Round 1 | M.Tech | OBC | 567.00 |
| 2025 | Round 1 | M.Tech | SC | 362.00 |
| 2025 | Round 1 | M.Tech | ST | 389.00 |
| 2025 | Round 1 | M.Tech | EWS | 582.00 |
| 2025 | Round 1 | M.Tech | General | 667.00 |
| 2025 | Round 1 | M.Tech | OBC | 535.00 |
| 2025 | Round 1 | M.Tech | SC | 486.00 |
| 2025 | Round 1 | M.Tech | ST | 401.00 |
| 2025 | Round 1 | M.Tech | EWS | 469.00 |
| 2025 | Round 1 | M.Tech | General | 535.00 |
| 2025 | Round 1 | M.Tech | OBC | 477.00 |
| 2025 | Round 1 | M.Tech | SC | 330.00 |
| 2025 | Round 1 | M.Tech | ST | 438.00 |
| 2025 | Round 1 | M.Tech | EWS | 506.00 |
| 2025 | Round 1 | M.Tech | General | 785.00 |
| 2025 | Round 1 | M.Tech | OBC | 675.00 |
| 2025 | Round 1 | M.Tech | SC | 693.00 |
| 2025 | Round 1 | M.Tech | ST | 712.00 |
| 2025 | - | M.Tech | General | 861.00 |
| 2025 | - | M.Tech | OBC | 830.00 |
| 2025 | - | M.Tech | SC | 735.00 |
| 2025 | - | M.Tech | ST | 530.00 |
| 2025 | - | M.Tech | EWS | 820.00 |
| 2025 | - | M.Tech | General | 690.00 |
| 2025 | - | M.Tech | OBC | 650.00 |
| 2025 | - | M.Tech | SC | 450.00 |
| 2025 | - | M.Tech | ST | 250.00 |
| 2025 | - | M.Tech | EWS | 620.00 |
| 2025 | - | M.Tech | General | 680.00 |
| 2025 | - | M.Tech | OBC | 660.00 |
| 2025 | - | M.Tech | SC | 350.00 |
| 2025 | - | M.Tech | ST | 350.00 |
| 2025 | - | M.Tech | EWS | 660.00 |
| 2025 | - | M.Tech | General | 600.00 |
| 2025 | - | M.Tech | OBC | 540.00 |
| 2025 | - | M.Tech | SC | 360.00 |
| 2025 | - | M.Tech | ST | 360.00 |
| 2025 | - | M.Tech | EWS | 540.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | - | M.Tech | OBC | 830.00 |
| 2025 | - | M.Tech | EWS | 843.00 |
| 2025 | - | M.Tech | SC | 678.00 |
| 2025 | - | M.Tech | ST | 575.00 |
| 2025 | - | M.Tech | General | 840.00 |
| 2025 | - | M.Tech | General | 820.00 |
| 2025 | - | M.Tech | OBC | 659.00 |
| 2025 | - | M.Tech | General | 830.00 |
| 2025 | - | M.Tech | SC | 690.00 |
| 2025 | - | M.Tech | General | 842.00 |
| 2025 | - | M.Tech | OBC | 842.00 |
| 2025 | - | M.Tech | General | 909.00 |
| 2025 | - | M.Tech | OBC | 647.00 |
| 2025 | - | M.Tech | General | 743.00 |
| 2025 | - | M.Tech | General | 780.00 |
| 2025 | - | M.Tech | General | 770.00 |
| 2025 | - | M.Tech | General | 750.00 |
| 2025 | - | M.Tech | General | 730.00 |
| 2025 | - | PhD | ST | 600.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | - | M.Tech | EWS | 843.00 |
| 2025 | - | M.Tech | OBC | 830.00 |
| 2025 | - | M.Tech | SC | 678.00 |
| 2025 | - | M.Tech | ST | 575.00 |
| 2025 | - | M.Tech | General | 892.00 |
| 2025 | - | M.Tech | OBC | 787.00 |
| 2025 | - | M.Tech | SC | 654.00 |
| 2025 | - | M.Tech | ST | 562.00 |
| 2025 | - | M.Tech | EWS | 855.00 |
| 2025 | - | M.Tech | General | 762.00 |
| 2025 | - | M.Tech | OBC | 682.00 |
| 2025 | - | M.Tech | SC | 494.00 |
| 2025 | - | M.Tech | ST | 380.00 |
| 2025 | - | M.Tech | EWS | 727.00 |
| 2025 | - | M.Tech | General | 721.00 |
| 2025 | - | M.Tech | OBC | 673.00 |
| 2025 | - | M.Tech | SC | 486.00 |
| 2025 | - | M.Tech | ST | 359.00 |
| 2025 | - | M.Tech | EWS | 686.00 |
| 2025 | - | M.Tech | General | 622.00 |
| 2025 | - | M.Tech | OBC | 595.00 |
| 2025 | - | M.Tech | SC | 393.00 |
| 2025 | - | M.Tech | ST | 424.00 |
| 2025 | - | M.Tech | EWS | 587.00 |
| 2025 | Round 1 | M.Tech | General | 903.00 |
| 2025 | Round 1 | M.Tech | OBC | 830.00 |
| 2025 | Round 1 | M.Tech | SC | 724.00 |
| 2025 | Round 1 | M.Tech | ST | 575.00 |
| 2025 | Round 1 | M.Tech | EWS | 843.00 |
| 2025 | Round 1 | M.Tech | General | 634.00 |
| 2025 | Round 1 | M.Tech | OBC | 567.00 |
| 2025 | Round 1 | M.Tech | SC | 362.00 |
| 2025 | Round 1 | M.Tech | ST | 389.00 |
| 2025 | Round 1 | M.Tech | EWS | 582.00 |
| 2025 | Round 1 | M.Tech | General | 659.00 |
| 2025 | Round 1 | M.Tech | OBC | 592.00 |
| 2025 | Round 1 | M.Tech | SC | 436.00 |
| 2025 | Round 1 | M.Tech | ST | 439.00 |
| 2025 | Round 1 | M.Tech | EWS | 581.00 |
| 2025 | Round 1 | M.Tech | General | 774.00 |
| 2025 | Round 1 | M.Tech | OBC | 706.00 |
| 2025 | Round 1 | M.Tech | SC | 497.00 |
| 2025 | Round 1 | M.Tech | ST | 338.00 |
| 2025 | Round 1 | M.Tech | EWS | 753.00 |
| 2025 | Round 1 | M.Tech | General | 785.00 |
| 2025 | Round 1 | M.Tech | OBC | 675.00 |
| 2025 | Round 1 | M.Tech | SC | 693.00 |
| 2025 | Round 1 | M.Tech | ST | 712.00 |
| 2025 | Round 1 | M.Tech | General | 667.00 |
| 2025 | Round 1 | M.Tech | OBC | 535.00 |
| 2025 | Round 1 | M.Tech | SC | 486.00 |
| 2025 | Round 1 | M.Tech | ST | 401.00 |
| 2025 | Round 1 | M.Tech | EWS | 469.00 |
| 2025 | - | M.Tech | General | 680.00 |
| 2025 | - | M.Tech | OBC | 660.00 |
| 2025 | - | M.Tech | SC | 350.00 |
| 2025 | - | M.Tech | ST | 350.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | - | M.Tech | OBC | 830.00 |
| 2025 | - | M.Tech | SC | 678.00 |
| 2025 | - | M.Tech | ST | 575.00 |
| 2025 | - | M.Tech | General | 900.00 |
| 2025 | - | M.Tech | OBC | 830.00 |
| 2025 | - | M.Tech | SC | 724.00 |
| 2025 | - | M.Tech | General | 861.00 |
| 2025 | - | M.Tech | OBC | 830.00 |
| 2025 | - | M.Tech | SC | 735.00 |
| 2025 | - | M.Tech | ST | 530.00 |
| 2025 | - | M.Tech | General | 690.00 |
| 2025 | - | M.Tech | OBC | 650.00 |
| 2025 | - | M.Tech | SC | 450.00 |
| 2025 | - | M.Tech | ST | 250.00 |
| 2025 | - | M.Tech | General | 600.00 |
| 2025 | - | M.Tech | OBC | 540.00 |
| 2025 | - | M.Tech | SC | 360.00 |
| 2025 | - | M.Tech | ST | 360.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | - | M.Tech | EWS | 843.00 |
| 2025 | - | M.Tech | OBC | 830.00 |
| 2025 | - | M.Tech | General | 690.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | - | M.Tech | OBC | 830.00 |
| 2025 | - | M.Tech | EWS | 843.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | - | M.Tech | OBC | 830.00 |
| 2025 | - | M.Tech | General | 690.00 |
| 2025 | - | M.Tech | General | 680.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | - | M.Tech | OBC | 830.00 |
| 2025 | - | M.Tech | SC | 678.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | - | M.Tech | OBC | 830.00 |
| 2025 | - | M.Tech | SC | 678.00 |
| 2025 | - | M.Tech | ST | 575.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | - | M.Tech | OBC | 830.00 |
| 2025 | - | M.Tech | EWS | 843.00 |
| 2025 | - | M.Tech | General | 835.00 |
| 2025 | - | M.Tech | General | 811.00 |
| 2025 | - | M.Tech | General | 774.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | - | M.Tech | OBC | 830.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | - | M.Tech | OBC | 830.00 |
| 2025 | - | M.Tech | ST | 575.00 |
| 2025 | - | M.Tech | General | 680.00 |
| 2025 | - | M.Tech | OBC | 660.00 |
| 2025 | - | M.Tech | SC | 350.00 |
| 2025 | - | M.Tech | ST | 350.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | - | M.Tech | OBC | 830.00 |
| 2025 | - | M.Tech | EWS | 843.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | - | M.Tech | General | 835.00 |
| 2025 | - | M.Tech | General | 811.00 |
| 2025 | - | M.Tech | General | 774.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | - | M.Tech | OBC | 830.00 |
| 2025 | - | M.Tech | SC | 678.00 |
| 2025 | - | M.Tech | General | 690.00 |
| 2025 | - | M.Tech | OBC | 650.00 |
| 2025 | - | M.Tech | SC | 450.00 |
| 2025 | - | M.Tech | ST | 250.00 |
| 2025 | - | M.Tech | General | 600.00 |
| 2025 | - | M.Tech | OBC | 540.00 |
| 2025 | - | M.Tech | SC | 360.00 |
| 2025 | - | M.Tech | ST | 360.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | - | M.Tech | OBC | 830.00 |
| 2025 | - | M.Tech | SC | 678.00 |
| 2025 | - | M.Tech | ST | 575.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | - | M.Tech | OBC | 830.00 |
| 2025 | - | M.Tech | SC | 678.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | - | M.Tech | General | 835.00 |
| 2025 | - | M.Tech | General | 811.00 |
| 2025 | - | M.Tech | General | 774.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | - | M.Tech | EWS | 843.00 |
| 2025 | - | M.Tech | OBC | 830.00 |
| 2025 | - | M.Tech | General | 713.00 |
| 2025 | - | M.Tech | EWS | 462.00 |
| 2025 | - | M.Tech | OBC | 612.00 |
| 2025 | - | M.Tech | SC | 486.00 |
| 2025 | - | M.Tech | ST | 440.00 |
| 2025 | - | M.Tech | General | 700.00 |
| 2025 | - | M.Tech | EWS | 650.00 |
| 2025 | - | M.Tech | OBC | 600.00 |
| 2025 | - | M.Tech | SC | 550.00 |
| 2025 | - | M.Tech | ST | 300.00 |
| 2025 | - | M.Tech | General | 665.00 |
| 2025 | - | M.Tech | EWS | 624.00 |
| 2025 | - | M.Tech | OBC | 420.00 |
| 2025 | - | M.Tech | General | 650.00 |
| 2025 | - | M.Tech | EWS | 585.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | - | M.Tech | EWS | 843.00 |
| 2025 | - | M.Tech | OBC | 830.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | - | M.Tech | OBC | 830.00 |
| 2025 | - | M.Tech | SC | 678.00 |
| 2025 | - | M.Tech | ST | 575.00 |
| 2025 | - | M.Tech | General | 861.00 |
| 2025 | - | M.Tech | OBC | 820.00 |
| 2025 | - | M.Tech | SC | 735.00 |
| 2025 | - | M.Tech | ST | 530.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | - | M.Tech | OBC | 830.00 |
| 2025 | - | M.Tech | SC | 678.00 |
| 2025 | - | M.Tech | ST | 575.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | - | M.Tech | EWS | 843.00 |
| 2025 | - | M.Tech | OBC | 830.00 |
| 2025 | - | M.Tech | SC | 678.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | - | M.Tech | OBC | 830.00 |
| 2025 | - | M.Tech | SC | 678.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | - | M.Tech | OBC | 830.00 |
| 2025 | - | M.Tech | SC | 678.00 |
| 2025 | - | M.Tech | ST | 575.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | - | M.Tech | General | 835.00 |
| 2025 | - | M.Tech | General | 811.00 |
| 2025 | - | M.Tech | General | 774.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | - | M.Tech | OBC | 830.00 |
| 2025 | - | M.Tech | SC | 678.00 |
| 2025 | - | M.Tech | ST | 575.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | - | M.Tech | OBC | 830.00 |
| 2025 | - | M.Tech | EWS | 843.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | - | M.Tech | OBC | 830.00 |
| 2025 | - | M.Tech | SC | 678.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | - | M.Tech | OBC | 830.00 |
| 2025 | - | M.Tech | EWS | 843.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | - | M.Tech | General | 835.00 |
| 2025 | - | M.Tech | General | 811.00 |
| 2025 | - | M.Tech | General | 774.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | - | M.Tech | OBC | 830.00 |
| 2025 | - | M.Tech | SC | 678.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | - | M.Tech | General | 835.00 |
| 2025 | - | M.Tech | General | 811.00 |
| 2025 | - | M.Tech | General | 774.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | Round 1 | M.Tech | General | 680.00 |
| 2025 | Round 1 | M.Tech | OBC | 660.00 |
| 2025 | Round 1 | M.Tech | SC | 350.00 |
| 2025 | Round 1 | M.Tech | ST | 350.00 |
| 2025 | Round 1 | M.Tech | EWS | 660.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | - | M.Tech | OBC | 830.00 |
| 2025 | - | M.Tech | SC | 678.00 |
| 2025 | - | M.Tech | ST | 575.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | - | M.Tech | OBC | 830.00 |
| 2025 | - | M.Tech | SC | 678.00 |
| 2025 | - | M.Tech | ST | 575.00 |
| 2025 | - | M.Tech | General | 600.00 |
| 2025 | - | M.Tech | OBC | 540.00 |
| 2025 | - | M.Tech | SC | 360.00 |
| 2025 | - | M.Tech | ST | 360.00 |
| 2025 | - | M.Tech | General | 903.00 |
| 2025 | - | M.Tech | OBC | 830.00 |
| 2025 | - | M.Tech | SC | 678.00 |
| 2025 | - | M.Tech | ST | 575.00 |
| 2025 | - | M.Tech | EWS | 630.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | ST | 600.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | EWS | 585.00 |
| 2024 | - | M.Tech | OBC | 650.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | Round 1 | M.Tech | General | 1000.00 |
| 2024 | Round 1 | M.Tech | OBC | 885.00 |
| 2024 | Round 1 | M.Tech | SC | 797.00 |
| 2024 | Round 1 | M.Tech | ST | 845.00 |
| 2024 | Round 1 | M.Tech | EWS | 885.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 925.00 |
| 2024 | - | M.Tech | EWS | 703.00 |
| 2024 | - | M.Tech | OBC | 825.00 |
| 2024 | - | M.Tech | SC | 668.00 |
| 2024 | - | M.Tech | ST | 639.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | EWS | 585.00 |
| 2024 | - | M.Tech | OBC | 650.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | General | 1000.00 |
| 2024 | - | M.Tech | OBC | 885.00 |
| 2024 | - | M.Tech | SC | 797.00 |
| 2024 | - | M.Tech | ST | 845.00 |
| 2024 | - | M.Tech | EWS | 885.00 |
| 2024 | - | M.Tech | General | 963.00 |
| 2024 | - | M.Tech | OBC | 829.00 |
| 2024 | - | M.Tech | SC | 747.00 |
| 2024 | - | M.Tech | ST | 588.00 |
| 2024 | - | M.Tech | EWS | 727.00 |
| 2024 | - | M.Tech | General | 876.00 |
| 2024 | - | M.Tech | OBC | 801.00 |
| 2024 | - | M.Tech | SC | 578.00 |
| 2024 | - | M.Tech | ST | 468.00 |
| 2024 | - | M.Tech | EWS | 630.00 |
| 2024 | - | M.Tech | General | 851.00 |
| 2024 | - | M.Tech | OBC | 677.00 |
| 2024 | - | M.Tech | SC | 424.00 |
| 2024 | - | M.Tech | ST | 310.00 |
| 2024 | - | M.Tech | EWS | 588.00 |
| 2024 | - | M.Tech | General | 878.00 |
| 2024 | - | M.Tech | OBC | 710.00 |
| 2024 | - | M.Tech | SC | 686.00 |
| 2024 | - | M.Tech | ST | 624.00 |
| 2024 | - | M.Tech | EWS | 693.00 |
| 2024 | - | M.Tech | General | 855.00 |
| 2024 | - | M.Tech | OBC | 498.00 |
| 2024 | - | M.Tech | SC | 458.00 |
| 2024 | - | M.Tech | ST | 301.00 |
| 2024 | - | M.Tech | EWS | 370.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | Round 2 | M.Tech | General | 700.00 |
| 2024 | Round 2 | M.Tech | OBC | 600.00 |
| 2024 | Round 2 | M.Tech | EWS | 650.00 |
| 2024 | Round 2 | M.Tech | SC | 550.00 |
| 2024 | Round 2 | M.Tech | ST | 300.00 |
| 2024 | Round 3 | M.Tech | General | 665.00 |
| 2024 | Round 3 | M.Tech | OBC | 420.00 |
| 2024 | Round 3 | M.Tech | EWS | 624.00 |
| 2024 | Round 3 | M.Tech | SC | 245.00 |
| 2024 | Round 3 | M.Tech | ST | 600.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 654.00 |
| 2024 | - | M.Tech | ST | 562.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | General | 925.00 |
| 2024 | - | M.Tech | OBC | 825.00 |
| 2024 | - | M.Tech | SC | 668.00 |
| 2024 | - | M.Tech | ST | 639.00 |
| 2024 | - | M.Tech | EWS | 703.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | Round 1 | M.Tech | General | 1000.00 |
| 2024 | Round 1 | M.Tech | OBC | 885.00 |
| 2024 | Round 1 | M.Tech | SC | 797.00 |
| 2024 | Round 1 | M.Tech | ST | 845.00 |
| 2024 | Round 1 | M.Tech | EWS | 885.00 |
| 2024 | Round 1 | M.Tech | General | 963.00 |
| 2024 | Round 1 | M.Tech | OBC | 829.00 |
| 2024 | Round 1 | M.Tech | SC | 747.00 |
| 2024 | Round 1 | M.Tech | ST | 588.00 |
| 2024 | Round 1 | M.Tech | EWS | 727.00 |
| 2024 | Round 1 | M.Tech | General | 878.00 |
| 2024 | Round 1 | M.Tech | OBC | 710.00 |
| 2024 | Round 1 | M.Tech | SC | 686.00 |
| 2024 | Round 1 | M.Tech | ST | 624.00 |
| 2024 | Round 1 | M.Tech | EWS | 693.00 |
| 2024 | Round 1 | M.Tech | General | 876.00 |
| 2024 | Round 1 | M.Tech | OBC | 801.00 |
| 2024 | Round 1 | M.Tech | SC | 578.00 |
| 2024 | Round 1 | M.Tech | ST | 468.00 |
| 2024 | Round 1 | M.Tech | EWS | 630.00 |
| 2024 | Round 1 | M.Tech | General | 851.00 |
| 2024 | Round 1 | M.Tech | OBC | 677.00 |
| 2024 | Round 1 | M.Tech | SC | 424.00 |
| 2024 | Round 1 | M.Tech | ST | 310.00 |
| 2024 | Round 1 | M.Tech | EWS | 588.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 654.00 |
| 2024 | - | M.Tech | ST | 562.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | General | 721.00 |
| 2024 | - | M.Tech | OBC | 673.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 359.00 |
| 2024 | - | M.Tech | EWS | 686.00 |
| 2024 | - | M.Tech | General | 622.00 |
| 2024 | - | M.Tech | OBC | 595.00 |
| 2024 | - | M.Tech | SC | 393.00 |
| 2024 | - | M.Tech | ST | 424.00 |
| 2024 | - | M.Tech | EWS | 587.00 |
| 2024 | - | M.Tech | General | 608.00 |
| 2024 | - | M.Tech | OBC | 505.00 |
| 2024 | - | M.Tech | SC | 360.00 |
| 2024 | - | M.Tech | ST | 310.00 |
| 2024 | - | M.Tech | EWS | 524.00 |
| 2024 | - | M.Tech | General | 863.00 |
| 2024 | - | M.Tech | OBC | 692.00 |
| 2024 | - | M.Tech | SC | 489.00 |
| 2024 | - | M.Tech | ST | 633.00 |
| 2024 | - | M.Tech | EWS | 737.00 |
| 2024 | - | M.Tech | General | 487.00 |
| 2024 | - | M.Tech | OBC | 438.00 |
| 2024 | - | M.Tech | SC | 276.00 |
| 2024 | - | M.Tech | ST | 301.00 |
| 2024 | - | M.Tech | EWS | 370.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | SC | 654.00 |
| 2024 | - | M.Tech | ST | 562.00 |
| 2024 | - | M.Tech | General | 721.00 |
| 2024 | - | M.Tech | OBC | 673.00 |
| 2024 | - | M.Tech | EWS | 686.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 359.00 |
| 2024 | - | M.Tech | General | 622.00 |
| 2024 | - | M.Tech | OBC | 595.00 |
| 2024 | - | M.Tech | EWS | 587.00 |
| 2024 | - | M.Tech | SC | 393.00 |
| 2024 | - | M.Tech | ST | 424.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | SC | 654.00 |
| 2024 | - | M.Tech | ST | 562.00 |
| 2024 | - | M.Tech | General | 622.00 |
| 2024 | - | M.Tech | OBC | 595.00 |
| 2024 | - | M.Tech | EWS | 587.00 |
| 2024 | - | M.Tech | SC | 393.00 |
| 2024 | - | M.Tech | ST | 424.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 925.00 |
| 2024 | - | M.Tech | OBC | 825.00 |
| 2024 | - | M.Tech | EWS | 703.00 |
| 2024 | - | M.Tech | SC | 668.00 |
| 2024 | - | M.Tech | ST | 639.00 |
| 2024 | - | M.Tech | General | 852.00 |
| 2024 | - | M.Tech | OBC | 769.00 |
| 2024 | - | M.Tech | SC | 519.00 |
| 2024 | - | M.Tech | ST | 431.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | General | 675.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | OBC | 518.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | General | 1000.00 |
| 2024 | - | M.Tech | EWS | 885.00 |
| 2024 | - | M.Tech | OBC | 885.00 |
| 2024 | - | M.Tech | SC | 797.00 |
| 2024 | - | M.Tech | ST | 845.00 |
| 2024 | - | M.Tech | General | 963.00 |
| 2024 | - | M.Tech | EWS | 727.00 |
| 2024 | - | M.Tech | OBC | 829.00 |
| 2024 | - | M.Tech | SC | 747.00 |
| 2024 | - | M.Tech | ST | 588.00 |
| 2024 | - | M.Tech | General | 876.00 |
| 2024 | - | M.Tech | EWS | 630.00 |
| 2024 | - | M.Tech | OBC | 801.00 |
| 2024 | - | M.Tech | SC | 578.00 |
| 2024 | - | M.Tech | ST | 468.00 |
| 2024 | - | M.Tech | General | 851.00 |
| 2024 | - | M.Tech | EWS | 588.00 |
| 2024 | - | M.Tech | OBC | 677.00 |
| 2024 | - | M.Tech | SC | 424.00 |
| 2024 | - | M.Tech | ST | 310.00 |
| 2024 | - | M.Tech | General | 878.00 |
| 2024 | - | M.Tech | EWS | 693.00 |
| 2024 | - | M.Tech | OBC | 710.00 |
| 2024 | - | M.Tech | SC | 686.00 |
| 2024 | - | M.Tech | ST | 624.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | General | 625.00 |
| 2024 | - | M.Tech | General | 600.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | General | 625.00 |
| 2024 | - | M.Tech | General | 621.00 |
| 2024 | - | M.Tech | General | 600.00 |
| 2024 | - | M.Tech | General | 350.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 654.00 |
| 2024 | - | M.Tech | ST | 562.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 654.00 |
| 2024 | - | M.Tech | ST | 562.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 925.00 |
| 2024 | - | M.Tech | OBC | 825.00 |
| 2024 | - | M.Tech | EWS | 703.00 |
| 2024 | - | M.Tech | SC | 668.00 |
| 2024 | - | M.Tech | ST | 639.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | OBC | 650.00 |
| 2024 | - | M.Tech | EWS | 585.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | - | M.Mgt | General | 742.00 |
| 2024 | Round 1 | M.Tech | General | 675.00 |
| 2024 | Round 1 | M.Tech | General | 665.00 |
| 2024 | Round 1 | M.Tech | General | 650.00 |
| 2024 | Round 1 | M.Tech | General | 480.00 |
| 2024 | Round 1 | M.Tech | General | 350.00 |
| 2024 | Round 1 | M.Tech | OBC | 300.00 |
| 2024 | Round 1 | M.Mgt | General | 742.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 654.00 |
| 2024 | - | M.Tech | ST | 562.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | General | 721.00 |
| 2024 | - | M.Tech | OBC | 673.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 359.00 |
| 2024 | - | M.Tech | EWS | 686.00 |
| 2024 | - | M.Tech | General | 622.00 |
| 2024 | - | M.Tech | OBC | 595.00 |
| 2024 | - | M.Tech | SC | 393.00 |
| 2024 | - | M.Tech | ST | 424.00 |
| 2024 | - | M.Tech | EWS | 587.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | EWS | 632.00 |
| 2024 | - | M.Tech | General | 487.00 |
| 2024 | - | M.Tech | OBC | 438.00 |
| 2024 | - | M.Tech | SC | 276.00 |
| 2024 | - | M.Tech | ST | 301.00 |
| 2024 | - | M.Tech | EWS | 370.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | EWS | 585.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | Round 1 | M.Tech | General | 892.00 |
| 2024 | Round 1 | M.Tech | OBC | 787.00 |
| 2024 | Round 1 | M.Tech | SC | 486.00 |
| 2024 | Round 1 | M.Tech | ST | 440.00 |
| 2024 | Round 1 | M.Tech | EWS | 855.00 |
| 2024 | Round 1 | M.Tech | General | 713.00 |
| 2024 | Round 1 | M.Tech | OBC | 612.00 |
| 2024 | Round 1 | M.Tech | SC | 486.00 |
| 2024 | Round 1 | M.Tech | ST | 440.00 |
| 2024 | Round 1 | M.Tech | EWS | 462.00 |
| 2024 | Round 1 | M.Tech | General | 925.00 |
| 2024 | Round 1 | M.Tech | OBC | 825.00 |
| 2024 | Round 1 | M.Tech | SC | 668.00 |
| 2024 | Round 1 | M.Tech | ST | 639.00 |
| 2024 | Round 1 | M.Tech | EWS | 703.00 |
| 2024 | Round 1 | M.Tech | General | 852.00 |
| 2024 | Round 1 | M.Tech | OBC | 769.00 |
| 2024 | Round 1 | M.Tech | SC | 519.00 |
| 2024 | Round 1 | M.Tech | ST | 431.00 |
| 2024 | Round 1 | M.Tech | EWS | 744.00 |
| 2024 | Round 1 | M.Tech | General | 758.00 |
| 2024 | Round 1 | M.Tech | OBC | 789.00 |
| 2024 | Round 1 | M.Tech | SC | 472.00 |
| 2024 | Round 1 | M.Tech | ST | 472.00 |
| 2024 | Round 1 | M.Tech | EWS | 600.00 |
| 2024 | Round 1 | M.Tech | General | 665.00 |
| 2024 | Round 1 | M.Tech | OBC | 420.00 |
| 2024 | Round 1 | M.Tech | SC | 245.00 |
| 2024 | Round 1 | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | EWS | 585.00 |
| 2024 | - | M.Tech | OBC | 650.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | ST | 600.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 925.00 |
| 2024 | - | M.Tech | OBC | 825.00 |
| 2024 | - | M.Tech | SC | 668.00 |
| 2024 | - | M.Tech | ST | 639.00 |
| 2024 | - | M.Tech | General | 852.00 |
| 2024 | - | M.Tech | OBC | 769.00 |
| 2024 | - | M.Tech | SC | 519.00 |
| 2024 | - | M.Tech | ST | 431.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | ST | 600.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 925.00 |
| 2024 | - | M.Tech | EWS | 703.00 |
| 2024 | - | M.Tech | OBC | 825.00 |
| 2024 | - | M.Tech | SC | 668.00 |
| 2024 | - | M.Tech | ST | 639.00 |
| 2024 | - | M.Tech | General | 852.00 |
| 2024 | - | M.Tech | EWS | 744.00 |
| 2024 | - | M.Tech | OBC | 769.00 |
| 2024 | - | M.Tech | SC | 519.00 |
| 2024 | - | M.Tech | ST | 431.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 675.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 925.00 |
| 2024 | - | M.Tech | EWS | 703.00 |
| 2024 | - | M.Tech | OBC | 825.00 |
| 2024 | - | M.Tech | SC | 668.00 |
| 2024 | - | M.Tech | ST | 639.00 |
| 2024 | - | M.Tech | General | 852.00 |
| 2024 | - | M.Tech | EWS | 744.00 |
| 2024 | - | M.Tech | OBC | 769.00 |
| 2024 | - | M.Tech | SC | 519.00 |
| 2024 | - | M.Tech | ST | 431.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | ME | General | 665.00 |
| 2024 | - | ME | EWS | 624.00 |
| 2024 | - | ME | OBC | 420.00 |
| 2024 | - | ME | SC | 245.00 |
| 2024 | - | ME | ST | 600.00 |
| 2024 | - | ME | General | 700.00 |
| 2024 | - | ME | EWS | 650.00 |
| 2024 | - | ME | OBC | 600.00 |
| 2024 | - | ME | SC | 550.00 |
| 2024 | - | ME | ST | 300.00 |
| 2024 | - | M.Tech | General | 1000.00 |
| 2024 | - | M.Tech | OBC | 885.00 |
| 2024 | - | M.Tech | SC | 797.00 |
| 2024 | - | M.Tech | ST | 845.00 |
| 2024 | - | M.Tech | EWS | 885.00 |
| 2024 | - | M.Tech | General | 963.00 |
| 2024 | - | M.Tech | OBC | 829.00 |
| 2024 | - | M.Tech | SC | 747.00 |
| 2024 | - | M.Tech | ST | 588.00 |
| 2024 | - | M.Tech | EWS | 727.00 |
| 2024 | - | M.Tech | General | 920.00 |
| 2024 | - | M.Tech | OBC | 804.00 |
| 2024 | - | M.Tech | SC | 724.00 |
| 2024 | - | M.Tech | ST | 385.00 |
| 2024 | - | M.Tech | EWS | 780.00 |
| 2024 | - | M.Tech | General | 878.00 |
| 2024 | - | M.Tech | OBC | 710.00 |
| 2024 | - | M.Tech | SC | 686.00 |
| 2024 | - | M.Tech | ST | 624.00 |
| 2024 | - | M.Tech | EWS | 693.00 |
| 2024 | - | M.Tech | General | 876.00 |
| 2024 | - | M.Tech | OBC | 801.00 |
| 2024 | - | M.Tech | SC | 578.00 |
| 2024 | - | M.Tech | ST | 468.00 |
| 2024 | - | M.Tech | EWS | 630.00 |
| 2024 | - | M.Tech | General | 851.00 |
| 2024 | - | M.Tech | OBC | 677.00 |
| 2024 | - | M.Tech | SC | 424.00 |
| 2024 | - | M.Tech | ST | 310.00 |
| 2024 | - | M.Tech | EWS | 588.00 |
| 2024 | Round 1 | M.Tech | General | 892.00 |
| 2024 | Round 1 | M.Tech | OBC | 787.00 |
| 2024 | Round 1 | M.Tech | SC | 654.00 |
| 2024 | Round 1 | M.Tech | ST | 562.00 |
| 2024 | Round 1 | M.Tech | EWS | 855.00 |
| 2024 | Round 1 | M.Tech | General | 721.00 |
| 2024 | Round 1 | M.Tech | OBC | 673.00 |
| 2024 | Round 1 | M.Tech | SC | 486.00 |
| 2024 | Round 1 | M.Tech | ST | 359.00 |
| 2024 | Round 1 | M.Tech | EWS | 686.00 |
| 2024 | Round 1 | M.Tech | General | 622.00 |
| 2024 | Round 1 | M.Tech | OBC | 595.00 |
| 2024 | Round 1 | M.Tech | SC | 393.00 |
| 2024 | Round 1 | M.Tech | ST | 424.00 |
| 2024 | Round 1 | M.Tech | EWS | 587.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 925.00 |
| 2024 | - | M.Tech | EWS | 703.00 |
| 2024 | - | M.Tech | OBC | 825.00 |
| 2024 | - | M.Tech | SC | 668.00 |
| 2024 | - | M.Tech | ST | 639.00 |
| 2024 | - | M.Tech | General | 852.00 |
| 2024 | - | M.Tech | EWS | 744.00 |
| 2024 | - | M.Tech | OBC | 769.00 |
| 2024 | - | M.Tech | SC | 519.00 |
| 2024 | - | M.Tech | ST | 431.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | Round 1 | M.Tech | General | 892.00 |
| 2024 | Round 1 | M.Tech | OBC | 787.00 |
| 2024 | Round 1 | M.Tech | SC | 654.00 |
| 2024 | Round 1 | M.Tech | ST | 562.00 |
| 2024 | Round 1 | M.Tech | EWS | 855.00 |
| 2024 | Round 1 | M.Tech | General | 721.00 |
| 2024 | Round 1 | M.Tech | OBC | 673.00 |
| 2024 | Round 1 | M.Tech | SC | 486.00 |
| 2024 | Round 1 | M.Tech | ST | 359.00 |
| 2024 | Round 1 | M.Tech | EWS | 686.00 |
| 2024 | Round 1 | M.Tech | General | 622.00 |
| 2024 | Round 1 | M.Tech | OBC | 595.00 |
| 2024 | Round 1 | M.Tech | SC | 393.00 |
| 2024 | Round 1 | M.Tech | ST | 424.00 |
| 2024 | Round 1 | M.Tech | EWS | 587.00 |
| 2024 | Round 1 | M.Tech | General | 608.00 |
| 2024 | Round 1 | M.Tech | OBC | 505.00 |
| 2024 | Round 1 | M.Tech | SC | 360.00 |
| 2024 | Round 1 | M.Tech | ST | 310.00 |
| 2024 | Round 1 | M.Tech | EWS | 524.00 |
| 2024 | Round 1 | M.Tech | General | 713.00 |
| 2024 | Round 1 | M.Tech | OBC | 612.00 |
| 2024 | Round 1 | M.Tech | SC | 486.00 |
| 2024 | Round 1 | M.Tech | ST | 440.00 |
| 2024 | Round 1 | M.Tech | EWS | 632.00 |
| 2024 | Round 1 | M.Tech | General | 487.00 |
| 2024 | Round 1 | M.Tech | OBC | 438.00 |
| 2024 | Round 1 | M.Tech | SC | 276.00 |
| 2024 | Round 1 | M.Tech | ST | 301.00 |
| 2024 | Round 1 | M.Tech | EWS | 370.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | OBC | 650.00 |
| 2024 | - | M.Tech | EWS | 585.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 925.00 |
| 2024 | - | M.Tech | EWS | 703.00 |
| 2024 | - | M.Tech | OBC | 825.00 |
| 2024 | - | M.Tech | SC | 668.00 |
| 2024 | - | M.Tech | ST | 639.00 |
| 2024 | - | M.Tech | General | 721.00 |
| 2024 | - | M.Tech | EWS | 686.00 |
| 2024 | - | M.Tech | OBC | 673.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 359.00 |
| 2024 | - | M.Tech | General | 622.00 |
| 2024 | - | M.Tech | EWS | 587.00 |
| 2024 | - | M.Tech | OBC | 595.00 |
| 2024 | - | M.Tech | SC | 393.00 |
| 2024 | - | M.Tech | ST | 424.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 654.00 |
| 2024 | - | M.Tech | ST | 562.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 654.00 |
| 2024 | - | M.Tech | ST | 562.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | General | 925.00 |
| 2024 | - | M.Tech | OBC | 825.00 |
| 2024 | - | M.Tech | SC | 668.00 |
| 2024 | - | M.Tech | ST | 639.00 |
| 2024 | - | M.Tech | General | 721.00 |
| 2024 | - | M.Tech | OBC | 673.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 359.00 |
| 2024 | - | M.Tech | EWS | 686.00 |
| 2024 | - | M.Tech | General | 622.00 |
| 2024 | - | M.Tech | OBC | 595.00 |
| 2024 | - | M.Tech | SC | 393.00 |
| 2024 | - | M.Tech | ST | 424.00 |
| 2024 | - | M.Tech | EWS | 587.00 |
| 2024 | - | M.Tech | General | 608.00 |
| 2024 | - | M.Tech | OBC | 505.00 |
| 2024 | - | M.Tech | SC | 360.00 |
| 2024 | - | M.Tech | ST | 310.00 |
| 2024 | - | M.Tech | EWS | 524.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | General | 925.00 |
| 2024 | - | M.Tech | OBC | 825.00 |
| 2024 | - | M.Tech | SC | 668.00 |
| 2024 | - | M.Tech | ST | 639.00 |
| 2024 | - | M.Tech | EWS | 703.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | ST | 600.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | Round 1 | M.Tech | General | 892.00 |
| 2024 | Round 1 | M.Tech | OBC | 787.00 |
| 2024 | Round 1 | M.Tech | SC | 654.00 |
| 2024 | Round 1 | M.Tech | ST | 562.00 |
| 2024 | Round 1 | M.Tech | General | 665.00 |
| 2024 | Round 1 | M.Tech | OBC | 640.00 |
| 2024 | Round 1 | M.Tech | SC | 500.00 |
| 2024 | Round 1 | M.Tech | ST | 500.00 |
| 2024 | Round 1 | M.Tech | General | 550.00 |
| 2024 | Round 1 | M.Tech | OBC | 500.00 |
| 2024 | Round 1 | M.Tech | SC | 350.00 |
| 2024 | Round 1 | M.Tech | ST | 350.00 |
| 2024 | - | M.Tech | General | 675.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | OBC | 650.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | OBC | 650.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | - | M.Tech | EWS | 585.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | ST | 600.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | SC | 654.00 |
| 2024 | - | M.Tech | ST | 562.00 |
| 2024 | - | M.Tech | General | 721.00 |
| 2024 | - | M.Tech | OBC | 673.00 |
| 2024 | - | M.Tech | EWS | 686.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 359.00 |
| 2024 | - | M.Tech | General | 622.00 |
| 2024 | - | M.Tech | OBC | 595.00 |
| 2024 | - | M.Tech | EWS | 587.00 |
| 2024 | - | M.Tech | SC | 393.00 |
| 2024 | - | M.Tech | ST | 424.00 |
| 2024 | - | M.Tech | General | 608.00 |
| 2024 | - | M.Tech | OBC | 505.00 |
| 2024 | - | M.Tech | EWS | 524.00 |
| 2024 | - | M.Tech | SC | 360.00 |
| 2024 | - | M.Tech | ST | 310.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | EWS | 632.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 925.00 |
| 2024 | - | M.Tech | OBC | 825.00 |
| 2024 | - | M.Tech | SC | 668.00 |
| 2024 | - | M.Tech | ST | 639.00 |
| 2024 | - | M.Tech | General | 852.00 |
| 2024 | - | M.Tech | OBC | 769.00 |
| 2024 | - | M.Tech | SC | 519.00 |
| 2024 | - | M.Tech | ST | 431.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | OBC | 650.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | ST | 600.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | OBC | 650.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | - | M.Tech | EWS | 585.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | ME | General | 665.00 |
| 2024 | - | ME | EWS | 624.00 |
| 2024 | - | ME | OBC | 420.00 |
| 2024 | - | ME | SC | 245.00 |
| 2024 | - | M.Tech | General-PwD | 713.00 |
| 2024 | Round 1 | M.Tech | General | 892.00 |
| 2024 | Round 1 | M.Tech | EWS | 855.00 |
| 2024 | Round 1 | M.Tech | OBC | 787.00 |
| 2024 | Round 1 | M.Tech | SC | 486.00 |
| 2024 | Round 1 | M.Tech | ST | 440.00 |
| 2024 | Round 1 | M.Tech | General | 713.00 |
| 2024 | Round 1 | M.Tech | EWS | 462.00 |
| 2024 | Round 1 | M.Tech | OBC | 612.00 |
| 2024 | Round 1 | M.Tech | SC | 486.00 |
| 2024 | Round 1 | M.Tech | ST | 440.00 |
| 2024 | Round 1 | M.Tech | General | 665.00 |
| 2024 | Round 1 | M.Tech | EWS | 624.00 |
| 2024 | Round 1 | M.Tech | OBC | 420.00 |
| 2024 | Round 1 | M.Tech | SC | 245.00 |
| 2024 | Round 1 | M.Tech | General | 700.00 |
| 2024 | Round 1 | M.Tech | EWS | 650.00 |
| 2024 | Round 1 | M.Tech | OBC | 600.00 |
| 2024 | Round 1 | M.Tech | SC | 550.00 |
| 2024 | Round 1 | M.Tech | ST | 300.00 |
| 2024 | Round 1 | M.Tech | General | 650.00 |
| 2024 | Round 1 | M.Tech | EWS | 585.00 |
| 2024 | Round 1 | M.Tech | SC | 390.00 |
| 2024 | Round 1 | M.Tech | ST | 390.00 |
| 2024 | Round 1 | M.Tech | General | 925.00 |
| 2024 | Round 1 | M.Tech | EWS | 703.00 |
| 2024 | Round 1 | M.Tech | OBC | 825.00 |
| 2024 | Round 1 | M.Tech | SC | 668.00 |
| 2024 | Round 1 | M.Tech | ST | 639.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | OBC | 650.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | - | M.Tech | EWS | 585.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | General | 925.00 |
| 2024 | - | M.Tech | OBC | 825.00 |
| 2024 | - | M.Tech | SC | 668.00 |
| 2024 | - | M.Tech | ST | 639.00 |
| 2024 | - | M.Tech | EWS | 703.00 |
| 2024 | - | M.Tech | General | 852.00 |
| 2024 | - | M.Tech | OBC | 769.00 |
| 2024 | - | M.Tech | SC | 519.00 |
| 2024 | - | M.Tech | ST | 431.00 |
| 2024 | - | M.Tech | EWS | 744.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | ST | 600.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | EWS | 585.00 |
| 2024 | - | M.Tech | OBC | 650.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | General | 625.00 |
| 2024 | - | M.Tech | General | 600.00 |
| 2024 | - | M.Tech | General | 350.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 925.00 |
| 2024 | - | M.Tech | OBC | 825.00 |
| 2024 | - | M.Tech | EWS | 703.00 |
| 2024 | - | M.Tech | SC | 668.00 |
| 2024 | - | M.Tech | ST | 639.00 |
| 2024 | - | M.Tech | General | 852.00 |
| 2024 | - | M.Tech | OBC | 769.00 |
| 2024 | - | M.Tech | EWS | 744.00 |
| 2024 | - | M.Tech | SC | 519.00 |
| 2024 | - | M.Tech | ST | 431.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | General | 950.00 |
| 2024 | - | M.Tech | OBC | 855.00 |
| 2024 | - | M.Tech | SC | 636.00 |
| 2024 | - | M.Tech | ST | 636.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | OBC | 650.00 |
| 2024 | - | M.Tech | EWS | 585.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | General | 625.00 |
| 2024 | - | M.Tech | General | 621.00 |
| 2024 | - | M.Tech | General | 600.00 |
| 2024 | - | M.Tech | General | 350.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | EWS | 585.00 |
| 2024 | - | M.Tech | OBC | 650.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | ST | 600.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 925.00 |
| 2024 | - | M.Tech | EWS | 703.00 |
| 2024 | - | M.Tech | OBC | 825.00 |
| 2024 | - | M.Tech | SC | 668.00 |
| 2024 | - | M.Tech | ST | 639.00 |
| 2024 | - | M.Tech | General | 852.00 |
| 2024 | - | M.Tech | EWS | 744.00 |
| 2024 | - | M.Tech | OBC | 769.00 |
| 2024 | - | M.Tech | SC | 519.00 |
| 2024 | - | M.Tech | ST | 431.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 654.00 |
| 2024 | - | M.Tech | ST | 562.00 |
| 2024 | - | M.Tech | General | 721.00 |
| 2024 | - | M.Tech | EWS | 686.00 |
| 2024 | - | M.Tech | OBC | 673.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 359.00 |
| 2024 | - | M.Tech | General | 622.00 |
| 2024 | - | M.Tech | EWS | 587.00 |
| 2024 | - | M.Tech | OBC | 595.00 |
| 2024 | - | M.Tech | SC | 393.00 |
| 2024 | - | M.Tech | ST | 424.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 632.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 608.00 |
| 2024 | - | M.Tech | EWS | 524.00 |
| 2024 | - | M.Tech | OBC | 505.00 |
| 2024 | - | M.Tech | SC | 360.00 |
| 2024 | - | M.Tech | ST | 310.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | EWS | 585.00 |
| 2024 | - | M.Tech | OBC | 650.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | ST | 600.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 925.00 |
| 2024 | - | M.Tech | EWS | 703.00 |
| 2024 | - | M.Tech | OBC | 825.00 |
| 2024 | - | M.Tech | SC | 668.00 |
| 2024 | - | M.Tech | ST | 639.00 |
| 2024 | - | M.Tech | General | 852.00 |
| 2024 | - | M.Tech | EWS | 744.00 |
| 2024 | - | M.Tech | OBC | 769.00 |
| 2024 | - | M.Tech | SC | 519.00 |
| 2024 | - | M.Tech | ST | 431.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | ST | 600.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 925.00 |
| 2024 | - | M.Tech | EWS | 703.00 |
| 2024 | - | M.Tech | OBC | 825.00 |
| 2024 | - | M.Tech | SC | 668.00 |
| 2024 | - | M.Tech | ST | 639.00 |
| 2024 | - | M.Tech | General | 852.00 |
| 2024 | - | M.Tech | EWS | 744.00 |
| 2024 | - | M.Tech | OBC | 769.00 |
| 2024 | - | M.Tech | SC | 519.00 |
| 2024 | - | M.Tech | ST | 431.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | OBC | 650.00 |
| 2024 | - | M.Tech | EWS | 585.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | EWS | 585.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 654.00 |
| 2024 | - | M.Tech | ST | 562.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | General | 925.00 |
| 2024 | - | M.Tech | OBC | 825.00 |
| 2024 | - | M.Tech | SC | 668.00 |
| 2024 | - | M.Tech | ST | 639.00 |
| 2024 | - | M.Tech | EWS | 703.00 |
| 2024 | - | M.Tech | General | 852.00 |
| 2024 | - | M.Tech | OBC | 769.00 |
| 2024 | - | M.Tech | SC | 519.00 |
| 2024 | - | M.Tech | ST | 431.00 |
| 2024 | - | M.Tech | EWS | 744.00 |
| 2024 | - | M.Tech | General | 721.00 |
| 2024 | - | M.Tech | OBC | 673.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 359.00 |
| 2024 | - | M.Tech | EWS | 686.00 |
| 2024 | - | M.Tech | General | 622.00 |
| 2024 | - | M.Tech | OBC | 595.00 |
| 2024 | - | M.Tech | SC | 393.00 |
| 2024 | - | M.Tech | ST | 424.00 |
| 2024 | - | M.Tech | EWS | 587.00 |
| 2024 | - | M.Tech | General | 608.00 |
| 2024 | - | M.Tech | OBC | 505.00 |
| 2024 | - | M.Tech | SC | 360.00 |
| 2024 | - | M.Tech | ST | 310.00 |
| 2024 | - | M.Tech | EWS | 524.00 |
| 2024 | - | M.Tech | General | 863.00 |
| 2024 | - | M.Tech | OBC | 692.00 |
| 2024 | - | M.Tech | SC | 489.00 |
| 2024 | - | M.Tech | ST | 633.00 |
| 2024 | - | M.Tech | EWS | 737.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 925.00 |
| 2024 | - | M.Tech | EWS | 703.00 |
| 2024 | - | M.Tech | OBC | 825.00 |
| 2024 | - | M.Tech | SC | 668.00 |
| 2024 | - | M.Tech | ST | 639.00 |
| 2024 | - | M.Tech | General | 852.00 |
| 2024 | - | M.Tech | EWS | 744.00 |
| 2024 | - | M.Tech | OBC | 769.00 |
| 2024 | - | M.Tech | SC | 519.00 |
| 2024 | - | M.Tech | ST | 431.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 758.00 |
| 2024 | - | M.Tech | OBC | 789.00 |
| 2024 | - | M.Tech | SC | 472.00 |
| 2024 | - | M.Tech | ST | 472.00 |
| 2024 | - | M.Tech | EWS | 600.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | General | 925.00 |
| 2024 | - | M.Tech | OBC | 825.00 |
| 2024 | - | M.Tech | SC | 668.00 |
| 2024 | - | M.Tech | ST | 639.00 |
| 2024 | - | M.Tech | EWS | 703.00 |
| 2024 | - | M.Tech | General | 852.00 |
| 2024 | - | M.Tech | OBC | 769.00 |
| 2024 | - | M.Tech | SC | 519.00 |
| 2024 | - | M.Tech | ST | 431.00 |
| 2024 | - | M.Tech | EWS | 744.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | ST | 600.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | EWS | 585.00 |
| 2024 | - | M.Tech | OBC | 650.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 654.00 |
| 2024 | - | M.Tech | ST | 562.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | ME | General | 721.00 |
| 2024 | - | ME | OBC | 673.00 |
| 2024 | - | ME | SC | 486.00 |
| 2024 | - | ME | ST | 359.00 |
| 2024 | - | ME | EWS | 686.00 |
| 2024 | - | M.Tech | General | 622.00 |
| 2024 | - | M.Tech | OBC | 595.00 |
| 2024 | - | M.Tech | SC | 393.00 |
| 2024 | - | M.Tech | ST | 424.00 |
| 2024 | - | M.Tech | EWS | 587.00 |
| 2024 | - | ME | General | 713.00 |
| 2024 | - | ME | OBC | 612.00 |
| 2024 | - | ME | SC | 486.00 |
| 2024 | - | ME | ST | 440.00 |
| 2024 | - | ME | EWS | 632.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | General | 350.00 |
| 2024 | - | M.Mgt | General | 742.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | OBC | 650.00 |
| 2024 | - | M.Tech | EWS | 585.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | Round 1 | M.Tech | General | 675.00 |
| 2024 | Round 1 | M.Tech | OBC | 640.00 |
| 2024 | Round 1 | M.Tech | SC | 500.00 |
| 2024 | Round 1 | M.Tech | ST | 350.00 |
| 2024 | Round 2 | M.Tech | General | 700.00 |
| 2024 | Round 2 | M.Tech | OBC | 650.00 |
| 2024 | Round 2 | M.Tech | SC | 425.00 |
| 2024 | Round 2 | M.Tech | ST | 245.00 |
| 2024 | Round 3 | M.Tech | General | 600.00 |
| 2024 | Round 3 | M.Tech | OBC | 500.00 |
| 2024 | Round 3 | M.Tech | SC | 360.00 |
| 2024 | Round 3 | M.Tech | ST | 360.00 |
| 2024 | Round 1 | M.Mgt | General | 742.00 |
| 2024 | Round 1 | M.Des | General | 500.00 |
| 2024 | Round 1 | M.Des | OBC | 400.00 |
| 2024 | Round 1 | M.Des | SC | 300.00 |
| 2024 | Round 1 | M.Des | ST | 300.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 518.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | EWS | 585.00 |
| 2024 | - | M.Tech | OBC | 650.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 675.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | General | 350.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | SC | 654.00 |
| 2024 | - | M.Tech | ST | 562.00 |
| 2024 | - | M.Tech | General | 721.00 |
| 2024 | - | M.Tech | OBC | 673.00 |
| 2024 | - | M.Tech | EWS | 686.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 359.00 |
| 2024 | - | M.Tech | General | 622.00 |
| 2024 | - | M.Tech | OBC | 595.00 |
| 2024 | - | M.Tech | EWS | 587.00 |
| 2024 | - | M.Tech | SC | 393.00 |
| 2024 | - | M.Tech | ST | 424.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 487.00 |
| 2024 | - | M.Tech | OBC | 438.00 |
| 2024 | - | M.Tech | EWS | 370.00 |
| 2024 | - | M.Tech | SC | 276.00 |
| 2024 | - | M.Tech | ST | 301.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | OBC | 650.00 |
| 2024 | - | M.Tech | EWS | 585.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | ST | 600.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | SC | 654.00 |
| 2024 | - | M.Tech | ST | 562.00 |
| 2024 | - | M.Tech | General | 721.00 |
| 2024 | - | M.Tech | OBC | 673.00 |
| 2024 | - | M.Tech | EWS | 686.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 359.00 |
| 2024 | - | M.Tech | General | 622.00 |
| 2024 | - | M.Tech | OBC | 595.00 |
| 2024 | - | M.Tech | EWS | 587.00 |
| 2024 | - | M.Tech | SC | 393.00 |
| 2024 | - | M.Tech | ST | 424.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | EWS | 632.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 827.00 |
| 2024 | - | M.Tech | OBC | 785.00 |
| 2024 | - | M.Tech | EWS | 780.00 |
| 2024 | - | M.Tech | SC | 693.00 |
| 2024 | - | M.Tech | ST | 385.00 |
| 2024 | - | M.Tech | General | 750.00 |
| 2024 | - | M.Tech | General | 625.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 654.00 |
| 2024 | - | M.Tech | ST | 562.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | General | 625.00 |
| 2024 | - | M.Tech | General | 621.00 |
| 2024 | - | M.Tech | General | 600.00 |
| 2024 | - | M.Tech | General | 350.00 |
| 2024 | - | M.Mgt | General | 710.00 |
| 2024 | - | M.Mgt | OBC | 560.00 |
| 2024 | - | M.Mgt | EWS | 530.00 |
| 2024 | - | M.Mgt | SC | 430.00 |
| 2024 | - | M.Mgt | ST | 380.00 |
| 2024 | Round 1 | M.Tech | General | 1000.00 |
| 2024 | Round 1 | M.Tech | OBC | 885.00 |
| 2024 | Round 1 | M.Tech | SC | 797.00 |
| 2024 | Round 1 | M.Tech | ST | 845.00 |
| 2024 | Round 1 | M.Tech | EWS | 855.00 |
| 2024 | Round 1 | ME | General | 881.00 |
| 2024 | Round 1 | ME | OBC | 826.00 |
| 2024 | Round 1 | ME | SC | 563.00 |
| 2024 | Round 1 | ME | ST | 380.00 |
| 2024 | Round 1 | ME | EWS | 727.00 |
| 2024 | Round 1 | M.Tech | General-PwD | 743.00 |
| 2024 | Round 1 | ME | General-PwD | 762.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 654.00 |
| 2024 | - | M.Tech | ST | 562.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | General | 863.00 |
| 2024 | - | M.Tech | OBC | 692.00 |
| 2024 | - | M.Tech | SC | 489.00 |
| 2024 | - | M.Tech | ST | 633.00 |
| 2024 | - | M.Tech | EWS | 737.00 |
| 2024 | - | M.Tech | General | 721.00 |
| 2024 | - | M.Tech | OBC | 673.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 359.00 |
| 2024 | - | M.Tech | EWS | 686.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | EWS | 632.00 |
| 2024 | - | M.Tech | General | 622.00 |
| 2024 | - | M.Tech | OBC | 595.00 |
| 2024 | - | M.Tech | SC | 393.00 |
| 2024 | - | M.Tech | ST | 424.00 |
| 2024 | - | M.Tech | EWS | 587.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 925.00 |
| 2024 | - | M.Tech | EWS | 703.00 |
| 2024 | - | M.Tech | OBC | 825.00 |
| 2024 | - | M.Tech | SC | 668.00 |
| 2024 | - | M.Tech | ST | 639.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | ST | 600.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 925.00 |
| 2024 | - | M.Tech | EWS | 703.00 |
| 2024 | - | M.Tech | OBC | 825.00 |
| 2024 | - | M.Tech | SC | 668.00 |
| 2024 | - | M.Tech | ST | 639.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | ST | 600.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | OBC | 650.00 |
| 2024 | - | M.Tech | EWS | 585.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 550.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | OBC | 650.00 |
| 2024 | - | M.Tech | EWS | 585.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | SC | 654.00 |
| 2024 | - | M.Tech | ST | 562.00 |
| 2024 | - | M.Tech | General | 721.00 |
| 2024 | - | M.Tech | OBC | 673.00 |
| 2024 | - | M.Tech | EWS | 686.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 359.00 |
| 2024 | - | M.Tech | General | 622.00 |
| 2024 | - | M.Tech | OBC | 595.00 |
| 2024 | - | M.Tech | EWS | 587.00 |
| 2024 | - | M.Tech | SC | 393.00 |
| 2024 | - | M.Tech | ST | 424.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | EWS | 632.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 608.00 |
| 2024 | - | M.Tech | OBC | 505.00 |
| 2024 | - | M.Tech | EWS | 524.00 |
| 2024 | - | M.Tech | SC | 360.00 |
| 2024 | - | M.Tech | ST | 310.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 550.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | OBC | 650.00 |
| 2024 | - | M.Tech | EWS | 585.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | OBC | 650.00 |
| 2024 | - | M.Tech | EWS | 585.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | - | M.Mgt | General | 742.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 925.00 |
| 2024 | - | M.Tech | OBC | 825.00 |
| 2024 | - | M.Tech | EWS | 703.00 |
| 2024 | - | M.Tech | SC | 668.00 |
| 2024 | - | M.Tech | ST | 639.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | Round 1 | M.Tech | General | 892.00 |
| 2024 | Round 1 | M.Tech | EWS | 855.00 |
| 2024 | Round 1 | M.Tech | OBC | 787.00 |
| 2024 | Round 1 | M.Tech | SC | 486.00 |
| 2024 | Round 1 | M.Tech | ST | 440.00 |
| 2024 | Round 1 | M.Tech | General | 700.00 |
| 2024 | Round 1 | M.Tech | EWS | 650.00 |
| 2024 | Round 1 | M.Tech | OBC | 600.00 |
| 2024 | Round 1 | M.Tech | SC | 550.00 |
| 2024 | Round 1 | M.Tech | ST | 300.00 |
| 2024 | Round 1 | M.Tech | General | 713.00 |
| 2024 | Round 1 | M.Tech | EWS | 462.00 |
| 2024 | Round 1 | M.Tech | OBC | 612.00 |
| 2024 | Round 1 | M.Tech | SC | 486.00 |
| 2024 | Round 1 | M.Tech | ST | 440.00 |
| 2024 | Round 1 | M.Tech | General | 665.00 |
| 2024 | Round 1 | M.Tech | EWS | 624.00 |
| 2024 | Round 1 | M.Tech | OBC | 420.00 |
| 2024 | Round 1 | M.Tech | SC | 245.00 |
| 2024 | Round 1 | M.Tech | General | 650.00 |
| 2024 | Round 1 | M.Tech | OBC | 650.00 |
| 2024 | Round 1 | M.Tech | SC | 390.00 |
| 2024 | Round 1 | M.Tech | ST | 390.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 925.00 |
| 2024 | - | M.Tech | EWS | 703.00 |
| 2024 | - | M.Tech | OBC | 825.00 |
| 2024 | - | M.Tech | SC | 668.00 |
| 2024 | - | M.Tech | ST | 639.00 |
| 2024 | - | M.Tech | General | 852.00 |
| 2024 | - | M.Tech | EWS | 744.00 |
| 2024 | - | M.Tech | OBC | 769.00 |
| 2024 | - | M.Tech | SC | 519.00 |
| 2024 | - | M.Tech | ST | 431.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 925.00 |
| 2024 | - | M.Tech | EWS | 703.00 |
| 2024 | - | M.Tech | OBC | 825.00 |
| 2024 | - | M.Tech | SC | 668.00 |
| 2024 | - | M.Tech | ST | 639.00 |
| 2024 | - | M.Tech | General | 852.00 |
| 2024 | - | M.Tech | EWS | 744.00 |
| 2024 | - | M.Tech | OBC | 769.00 |
| 2024 | - | M.Tech | SC | 519.00 |
| 2024 | - | M.Tech | ST | 431.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 654.00 |
| 2024 | - | M.Tech | ST | 562.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | General | 608.00 |
| 2024 | - | M.Tech | OBC | 505.00 |
| 2024 | - | M.Tech | SC | 360.00 |
| 2024 | - | M.Tech | ST | 310.00 |
| 2024 | - | M.Tech | EWS | 524.00 |
| 2024 | - | M.Tech | General | 721.00 |
| 2024 | - | M.Tech | OBC | 673.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 359.00 |
| 2024 | - | M.Tech | EWS | 686.00 |
| 2024 | - | M.Mgt | General | 742.00 |
| 2024 | - | M.Mgt | OBC | 690.00 |
| 2024 | - | M.Mgt | SC | 535.00 |
| 2024 | - | M.Mgt | ST | 418.00 |
| 2024 | - | M.Mgt | EWS | 686.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | EWS | 585.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | Round 1 | M.Tech | General | 892.00 |
| 2024 | Round 1 | M.Tech | OBC | 787.00 |
| 2024 | Round 1 | M.Tech | SC | 654.00 |
| 2024 | Round 1 | M.Tech | ST | 562.00 |
| 2024 | Round 1 | M.Tech | EWS | 855.00 |
| 2024 | Round 1 | M.Tech | General | 665.00 |
| 2024 | Round 1 | M.Tech | OBC | 624.00 |
| 2024 | - | M.Tech | General | 925.00 |
| 2024 | - | M.Tech | EWS | 703.00 |
| 2024 | - | M.Tech | OBC | 825.00 |
| 2024 | - | M.Tech | SC | 668.00 |
| 2024 | - | M.Tech | ST | 639.00 |
| 2024 | - | ME | General | 713.00 |
| 2024 | - | ME | EWS | 462.00 |
| 2024 | - | ME | OBC | 612.00 |
| 2024 | - | ME | SC | 486.00 |
| 2024 | - | ME | ST | 440.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 925.00 |
| 2024 | - | M.Tech | EWS | 703.00 |
| 2024 | - | M.Tech | OBC | 825.00 |
| 2024 | - | M.Tech | SC | 668.00 |
| 2024 | - | M.Tech | ST | 639.00 |
| 2024 | - | M.Tech | General | 852.00 |
| 2024 | - | M.Tech | EWS | 744.00 |
| 2024 | - | M.Tech | OBC | 769.00 |
| 2024 | - | M.Tech | SC | 519.00 |
| 2024 | - | M.Tech | ST | 431.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 675.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | SC | 654.00 |
| 2024 | - | M.Tech | ST | 562.00 |
| 2024 | - | ME | General | 721.00 |
| 2024 | - | ME | OBC | 673.00 |
| 2024 | - | ME | EWS | 686.00 |
| 2024 | - | ME | SC | 486.00 |
| 2024 | - | ME | ST | 359.00 |
| 2024 | Round 2 | ME | General | 622.00 |
| 2024 | - | M.Mgt | General | 742.00 |
| 2024 | - | M.Mgt | OBC | 690.00 |
| 2024 | - | M.Mgt | SC | 535.00 |
| 2024 | - | M.Mgt | ST | 418.00 |
| 2024 | - | M.Tech | General | 1000.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 885.00 |
| 2024 | - | M.Tech | SC | 797.00 |
| 2024 | - | M.Tech | ST | 845.00 |
| 2024 | - | M.Tech | General | 881.00 |
| 2024 | - | M.Tech | EWS | 727.00 |
| 2024 | - | M.Tech | OBC | 826.00 |
| 2024 | - | M.Tech | SC | 563.00 |
| 2024 | - | M.Tech | ST | 380.00 |
| 2024 | Round 1 | M.Tech | General | 892.00 |
| 2024 | Round 1 | M.Tech | EWS | 855.00 |
| 2024 | Round 1 | M.Tech | OBC | 787.00 |
| 2024 | Round 1 | M.Tech | SC | 486.00 |
| 2024 | Round 1 | M.Tech | ST | 440.00 |
| 2024 | Round 1 | M.Tech | General | 713.00 |
| 2024 | Round 1 | M.Tech | EWS | 462.00 |
| 2024 | Round 1 | M.Tech | OBC | 612.00 |
| 2024 | Round 1 | M.Tech | SC | 486.00 |
| 2024 | Round 1 | M.Tech | ST | 440.00 |
| 2024 | Round 1 | M.Tech | General | 700.00 |
| 2024 | Round 1 | M.Tech | EWS | 650.00 |
| 2024 | Round 1 | M.Tech | OBC | 600.00 |
| 2024 | Round 1 | M.Tech | SC | 550.00 |
| 2024 | Round 1 | M.Tech | ST | 300.00 |
| 2024 | Round 1 | M.Tech | General | 650.00 |
| 2024 | Round 1 | M.Tech | EWS | 585.00 |
| 2024 | Round 1 | M.Tech | OBC | 650.00 |
| 2024 | Round 1 | M.Tech | SC | 390.00 |
| 2024 | Round 1 | M.Tech | ST | 390.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 654.00 |
| 2024 | - | M.Tech | ST | 562.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | General | 622.00 |
| 2024 | - | M.Tech | OBC | 595.00 |
| 2024 | - | M.Tech | SC | 393.00 |
| 2024 | - | M.Tech | ST | 424.00 |
| 2024 | - | M.Tech | EWS | 587.00 |
| 2024 | - | M.Tech | General | 608.00 |
| 2024 | - | M.Tech | OBC | 505.00 |
| 2024 | - | M.Tech | SC | 360.00 |
| 2024 | - | M.Tech | ST | 310.00 |
| 2024 | - | M.Tech | EWS | 524.00 |
| 2024 | - | M.Tech | General | 721.00 |
| 2024 | - | M.Tech | OBC | 673.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 359.00 |
| 2024 | - | M.Tech | EWS | 686.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | EWS | 632.00 |
| 2024 | - | M.Tech | General | 1000.00 |
| 2024 | - | M.Tech | OBC | 885.00 |
| 2024 | - | M.Tech | SC | 797.00 |
| 2024 | - | M.Tech | ST | 845.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | Round 1 | M.Tech | General | 966.00 |
| 2024 | Round 1 | M.Tech | OBC | 829.00 |
| 2024 | Round 1 | M.Tech | SC | 747.00 |
| 2024 | Round 1 | M.Tech | ST | 588.00 |
| 2024 | Round 1 | M.Tech | EWS | 727.00 |
| 2024 | Round 2 | M.Tech | General | 876.00 |
| 2024 | Round 2 | M.Tech | OBC | 801.00 |
| 2024 | Round 2 | M.Tech | SC | 578.00 |
| 2024 | Round 2 | M.Tech | ST | 468.00 |
| 2024 | Round 2 | M.Tech | EWS | 630.00 |
| 2024 | Round 3 | M.Tech | General | 881.00 |
| 2024 | Round 3 | M.Tech | OBC | 826.00 |
| 2024 | Round 3 | M.Tech | SC | 563.00 |
| 2024 | Round 3 | M.Tech | ST | 380.00 |
| 2024 | Round 3 | M.Tech | EWS | 727.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 654.00 |
| 2024 | - | M.Tech | ST | 562.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | General | 762.00 |
| 2024 | - | M.Tech | OBC | 682.00 |
| 2024 | - | M.Tech | SC | 494.00 |
| 2024 | - | M.Tech | ST | 380.00 |
| 2024 | - | M.Tech | EWS | 727.00 |
| 2024 | - | M.Tech | General | 622.00 |
| 2024 | - | M.Tech | OBC | 595.00 |
| 2024 | - | M.Tech | SC | 393.00 |
| 2024 | - | M.Tech | ST | 424.00 |
| 2024 | - | M.Tech | EWS | 587.00 |
| 2024 | - | M.Tech | General | 721.00 |
| 2024 | - | M.Tech | OBC | 673.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 359.00 |
| 2024 | - | M.Tech | EWS | 686.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 654.00 |
| 2024 | - | M.Tech | ST | 562.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | General | 608.00 |
| 2024 | - | M.Tech | OBC | 505.00 |
| 2024 | - | M.Tech | SC | 360.00 |
| 2024 | - | M.Tech | ST | 310.00 |
| 2024 | - | M.Tech | EWS | 524.00 |
| 2024 | - | M.Tech | General | 622.00 |
| 2024 | - | M.Tech | OBC | 595.00 |
| 2024 | - | M.Tech | SC | 393.00 |
| 2024 | - | M.Tech | ST | 424.00 |
| 2024 | - | M.Tech | EWS | 587.00 |
| 2024 | - | M.Tech | General | 721.00 |
| 2024 | - | M.Tech | OBC | 673.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 359.00 |
| 2024 | - | M.Tech | EWS | 686.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | General | 487.00 |
| 2024 | - | M.Tech | OBC | 438.00 |
| 2024 | - | M.Tech | SC | 276.00 |
| 2024 | - | M.Tech | ST | 301.00 |
| 2024 | - | M.Tech | EWS | 370.00 |
| 2024 | - | M.Tech | General | 827.00 |
| 2024 | - | M.Tech | OBC | 785.00 |
| 2024 | - | M.Tech | SC | 693.00 |
| 2024 | - | M.Tech | ST | 385.00 |
| 2024 | - | M.Tech | General | 602.00 |
| 2024 | - | M.Tech | OBC | 401.00 |
| 2024 | - | M.Tech | SC | 402.00 |
| 2024 | - | M.Tech | ST | 345.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | ME | General | 665.00 |
| 2024 | - | ME | EWS | 624.00 |
| 2024 | - | ME | OBC | 420.00 |
| 2024 | - | ME | ST | 600.00 |
| 2024 | - | ME | SC | 245.00 |
| 2024 | Round 1 | M.Tech | General | 713.00 |
| 2024 | Round 1 | M.Tech | OBC | 612.00 |
| 2024 | Round 1 | M.Tech | SC | 486.00 |
| 2024 | Round 1 | M.Tech | ST | 440.00 |
| 2024 | Round 1 | M.Tech | EWS | 462.00 |
| 2024 | Round 1 | M.Tech | General | 675.00 |
| 2024 | Round 1 | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 654.00 |
| 2024 | - | M.Tech | ST | 562.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | General | 762.00 |
| 2024 | - | M.Tech | OBC | 682.00 |
| 2024 | - | M.Tech | SC | 494.00 |
| 2024 | - | M.Tech | ST | 380.00 |
| 2024 | - | M.Tech | EWS | 727.00 |
| 2024 | - | M.Tech | General | 721.00 |
| 2024 | - | M.Tech | OBC | 673.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 359.00 |
| 2024 | - | M.Tech | EWS | 686.00 |
| 2024 | - | M.Tech | General | 622.00 |
| 2024 | - | M.Tech | OBC | 595.00 |
| 2024 | - | M.Tech | SC | 393.00 |
| 2024 | - | M.Tech | ST | 424.00 |
| 2024 | - | M.Tech | EWS | 587.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 654.00 |
| 2024 | - | M.Tech | ST | 562.00 |
| 2024 | - | M.Tech | General | 925.00 |
| 2024 | - | M.Tech | OBC | 825.00 |
| 2024 | - | M.Tech | SC | 668.00 |
| 2024 | - | M.Tech | ST | 639.00 |
| 2024 | - | M.Tech | General | 721.00 |
| 2024 | - | M.Tech | OBC | 673.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 359.00 |
| 2024 | - | M.Tech | General | 762.00 |
| 2024 | - | M.Tech | OBC | 682.00 |
| 2024 | - | M.Tech | SC | 494.00 |
| 2024 | - | M.Tech | ST | 380.00 |
| 2024 | - | M.Tech | General | 622.00 |
| 2024 | - | M.Tech | OBC | 595.00 |
| 2024 | - | M.Tech | SC | 393.00 |
| 2024 | - | M.Mgt | General | 742.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 654.00 |
| 2024 | - | M.Tech | ST | 562.00 |
| 2024 | - | M.Tech | General | 1000.00 |
| 2024 | - | M.Tech | OBC | 885.00 |
| 2024 | - | M.Tech | SC | 797.00 |
| 2024 | - | M.Tech | ST | 845.00 |
| 2024 | - | M.Tech | EWS | 885.00 |
| 2024 | - | M.Tech | General | 963.00 |
| 2024 | - | M.Tech | OBC | 829.00 |
| 2024 | - | M.Tech | SC | 747.00 |
| 2024 | - | M.Tech | ST | 588.00 |
| 2024 | - | M.Tech | EWS | 727.00 |
| 2024 | - | M.Tech | General | 876.00 |
| 2024 | - | M.Tech | OBC | 801.00 |
| 2024 | - | M.Tech | SC | 578.00 |
| 2024 | - | M.Tech | ST | 468.00 |
| 2024 | - | M.Tech | EWS | 630.00 |
| 2024 | - | M.Tech | General | 878.00 |
| 2024 | - | M.Tech | OBC | 710.00 |
| 2024 | - | M.Tech | SC | 686.00 |
| 2024 | - | M.Tech | ST | 624.00 |
| 2024 | - | M.Tech | EWS | 693.00 |
| 2024 | - | M.Tech | General | 851.00 |
| 2024 | - | M.Tech | OBC | 677.00 |
| 2024 | - | M.Tech | SC | 424.00 |
| 2024 | - | M.Tech | ST | 310.00 |
| 2024 | - | M.Tech | EWS | 588.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 654.00 |
| 2024 | - | M.Tech | ST | 562.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | General | 721.00 |
| 2024 | - | M.Tech | OBC | 673.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 359.00 |
| 2024 | - | M.Tech | EWS | 686.00 |
| 2024 | - | M.Tech | General | 622.00 |
| 2024 | - | M.Tech | OBC | 595.00 |
| 2024 | - | M.Tech | SC | 393.00 |
| 2024 | - | M.Tech | ST | 424.00 |
| 2024 | - | M.Tech | EWS | 587.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Des | General | 500.00 |
| 2024 | - | M.Des | OBC | 400.00 |
| 2024 | - | M.Des | SC | 300.00 |
| 2024 | - | M.Des | ST | 300.00 |
| 2024 | - | M.Des | EWS | 400.00 |
| 2024 | - | M.Mgt | General | 742.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | ST | 600.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | OBC | 650.00 |
| 2024 | - | M.Tech | EWS | 585.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | OBC | 650.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | EWS | 585.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 654.00 |
| 2024 | - | M.Tech | ST | 562.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | General | 625.00 |
| 2024 | - | M.Tech | General | 621.00 |
| 2024 | - | M.Tech | General | 600.00 |
| 2024 | - | M.Tech | General | 350.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 925.00 |
| 2024 | - | M.Tech | OBC | 825.00 |
| 2024 | - | M.Tech | EWS | 703.00 |
| 2024 | - | M.Tech | SC | 668.00 |
| 2024 | - | M.Tech | ST | 639.00 |
| 2024 | - | M.Tech | General | 852.00 |
| 2024 | - | M.Tech | OBC | 769.00 |
| 2024 | - | M.Tech | EWS | 744.00 |
| 2024 | - | M.Tech | SC | 519.00 |
| 2024 | - | M.Tech | ST | 431.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | ST | 600.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | OBC | 650.00 |
| 2024 | - | M.Tech | EWS | 585.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | ME | General | 700.00 |
| 2024 | - | ME | EWS | 650.00 |
| 2024 | - | ME | OBC | 600.00 |
| 2024 | - | ME | SC | 550.00 |
| 2024 | - | ME | ST | 300.00 |
| 2024 | Round 2 | M.Tech | General | 713.00 |
| 2024 | Round 2 | M.Tech | EWS | 462.00 |
| 2024 | Round 2 | M.Tech | OBC | 612.00 |
| 2024 | Round 2 | M.Tech | SC | 486.00 |
| 2024 | Round 2 | M.Tech | ST | 440.00 |
| 2024 | Round 2 | ME | General | 665.00 |
| 2024 | Round 2 | ME | EWS | 624.00 |
| 2024 | Round 2 | ME | OBC | 420.00 |
| 2024 | Round 2 | ME | SC | 245.00 |
| 2024 | Round 2 | ME | ST | 600.00 |
| 2024 | Round 3 | M.Tech | General | 650.00 |
| 2024 | Round 3 | M.Tech | OBC | 650.00 |
| 2024 | Round 3 | M.Tech | SC | 390.00 |
| 2024 | Round 3 | M.Tech | ST | 390.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 654.00 |
| 2024 | - | M.Tech | ST | 562.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | ST | 600.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | OBC | 650.00 |
| 2024 | - | M.Tech | EWS | 585.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | ST | 600.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | OBC | 650.00 |
| 2024 | - | M.Tech | EWS | 585.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | EWS | 585.00 |
| 2024 | - | M.Tech | OBC | 650.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | - | M.Tech | General | 1000.00 |
| 2024 | - | M.Tech | OBC | 885.00 |
| 2024 | - | M.Tech | SC | 797.00 |
| 2024 | - | M.Tech | ST | 845.00 |
| 2024 | - | M.Tech | EWS | 885.00 |
| 2024 | - | M.Tech | General | 963.00 |
| 2024 | - | M.Tech | OBC | 829.00 |
| 2024 | - | M.Tech | SC | 747.00 |
| 2024 | - | M.Tech | ST | 588.00 |
| 2024 | - | M.Tech | EWS | 727.00 |
| 2024 | - | M.Tech | General | 876.00 |
| 2024 | - | M.Tech | OBC | 801.00 |
| 2024 | - | M.Tech | SC | 578.00 |
| 2024 | - | M.Tech | ST | 468.00 |
| 2024 | - | M.Tech | EWS | 630.00 |
| 2024 | - | M.Tech | General | 675.00 |
| 2024 | - | M.Tech | OBC | 640.00 |
| 2024 | - | M.Tech | SC | 500.00 |
| 2024 | - | M.Tech | ST | 350.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | ME | General | 700.00 |
| 2024 | - | ME | OBC | 650.00 |
| 2024 | - | ME | SC | 425.00 |
| 2024 | - | ME | ST | 245.00 |
| 2024 | - | ME | EWS | 650.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | OBC | 650.00 |
| 2024 | - | M.Tech | EWS | 585.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Mgt | General | 742.00 |
| 2024 | Round 1 | M.Tech | General | 892.00 |
| 2024 | Round 1 | M.Tech | EWS | 855.00 |
| 2024 | Round 1 | M.Tech | OBC | 787.00 |
| 2024 | Round 1 | M.Tech | SC | 486.00 |
| 2024 | Round 1 | M.Tech | ST | 440.00 |
| 2024 | Round 1 | M.Tech | General | 925.00 |
| 2024 | Round 1 | M.Tech | EWS | 703.00 |
| 2024 | Round 1 | M.Tech | OBC | 825.00 |
| 2024 | Round 1 | M.Tech | SC | 668.00 |
| 2024 | Round 1 | M.Tech | ST | 639.00 |
| 2024 | Round 1 | M.Tech | General | 852.00 |
| 2024 | Round 1 | M.Tech | EWS | 744.00 |
| 2024 | Round 1 | M.Tech | OBC | 769.00 |
| 2024 | Round 1 | M.Tech | SC | 519.00 |
| 2024 | Round 1 | M.Tech | ST | 431.00 |
| 2024 | Round 1 | M.Tech | General | 713.00 |
| 2024 | Round 1 | M.Tech | EWS | 462.00 |
| 2024 | Round 1 | M.Tech | OBC | 612.00 |
| 2024 | Round 1 | M.Tech | SC | 486.00 |
| 2024 | Round 1 | M.Tech | ST | 440.00 |
| 2024 | Round 1 | M.Tech | General | 665.00 |
| 2024 | Round 1 | M.Tech | EWS | 624.00 |
| 2024 | Round 1 | M.Tech | OBC | 420.00 |
| 2024 | Round 1 | M.Tech | SC | 245.00 |
| 2024 | Round 1 | M.Tech | General | 700.00 |
| 2024 | Round 1 | M.Tech | EWS | 650.00 |
| 2024 | Round 1 | M.Tech | OBC | 600.00 |
| 2024 | Round 1 | M.Tech | SC | 550.00 |
| 2024 | Round 1 | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 875.00 |
| 2024 | - | M.Tech | General | 750.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | General | 350.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 925.00 |
| 2024 | - | M.Tech | EWS | 703.00 |
| 2024 | - | M.Tech | OBC | 825.00 |
| 2024 | - | M.Tech | SC | 668.00 |
| 2024 | - | M.Tech | ST | 639.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | ST | 600.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | EWS | 585.00 |
| 2024 | - | M.Tech | OBC | 650.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | EWS | 585.00 |
| 2024 | - | M.Tech | OBC | 650.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | ST | 600.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 654.00 |
| 2024 | - | M.Tech | ST | 562.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | EWS | 585.00 |
| 2024 | - | M.Tech | OBC | 650.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 925.00 |
| 2024 | - | M.Tech | EWS | 703.00 |
| 2024 | - | M.Tech | OBC | 825.00 |
| 2024 | - | M.Tech | SC | 668.00 |
| 2024 | - | M.Tech | ST | 639.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | EWS | 585.00 |
| 2024 | - | M.Tech | OBC | 650.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | Round 1 | M.Tech | General | 892.00 |
| 2024 | Round 1 | M.Tech | EWS | 855.00 |
| 2024 | Round 1 | M.Tech | OBC | 787.00 |
| 2024 | Round 1 | M.Tech | SC | 486.00 |
| 2024 | Round 1 | M.Tech | ST | 440.00 |
| 2024 | Round 1 | M.Tech | General | 713.00 |
| 2024 | Round 1 | M.Tech | EWS | 462.00 |
| 2024 | Round 1 | M.Tech | OBC | 612.00 |
| 2024 | Round 1 | M.Tech | SC | 486.00 |
| 2024 | Round 1 | M.Tech | ST | 440.00 |
| 2024 | Round 1 | M.Tech | General | 700.00 |
| 2024 | Round 1 | M.Tech | EWS | 650.00 |
| 2024 | Round 1 | M.Tech | OBC | 600.00 |
| 2024 | Round 1 | M.Tech | SC | 550.00 |
| 2024 | Round 1 | M.Tech | ST | 300.00 |
| 2024 | Round 1 | M.Tech | General | 650.00 |
| 2024 | Round 1 | M.Tech | SC | 390.00 |
| 2024 | Round 1 | M.Tech | ST | 390.00 |
| 2024 | - | MBA | General | 742.00 |
| 2024 | - | MBA | OBC | 690.00 |
| 2024 | - | MBA | SC | 535.00 |
| 2024 | - | MBA | ST | 418.00 |
| 2024 | - | MBA | General-PwD | 675.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 654.00 |
| 2024 | - | M.Tech | ST | 562.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 654.00 |
| 2024 | - | M.Tech | ST | 562.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | Round 1 | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | General | 1000.00 |
| 2024 | - | M.Tech | EWS | 885.00 |
| 2024 | - | M.Tech | OBC | 885.00 |
| 2024 | - | M.Tech | SC | 797.00 |
| 2024 | - | M.Tech | ST | 845.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 654.00 |
| 2024 | - | M.Tech | ST | 562.00 |
| 2024 | - | M.Tech | General | 750.00 |
| 2024 | - | M.Tech | OBC | 675.00 |
| 2024 | - | M.Tech | SC | 350.00 |
| 2024 | - | M.Tech | ST | 350.00 |
| 2024 | - | M.Tech | General | 875.00 |
| 2024 | - | M.Tech | OBC | 815.00 |
| 2024 | - | M.Tech | SC | 630.00 |
| 2024 | - | M.Tech | ST | 450.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | OBC | 624.00 |
| 2024 | - | M.Tech | SC | 420.00 |
| 2024 | - | M.Tech | ST | 245.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | OBC | 585.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | - | M.Tech | General | 350.00 |
| 2024 | - | M.Tech | OBC | 250.00 |
| 2024 | - | M.Tech | SC | 200.00 |
| 2024 | - | M.Tech | ST | 200.00 |
| 2024 | - | M.Tech | General | 745.00 |
| 2024 | - | M.Tech | OBC | 720.00 |
| 2024 | - | M.Tech | SC | 500.00 |
| 2024 | - | M.Tech | ST | 460.00 |
| 2024 | - | M.Tech | General | 800.00 |
| 2024 | - | M.Tech | OBC | 700.00 |
| 2024 | - | M.Tech | SC | 600.00 |
| 2024 | - | M.Tech | ST | 600.00 |
| 2024 | - | M.Tech | General | 600.00 |
| 2024 | - | M.Tech | OBC | 500.00 |
| 2024 | - | M.Tech | SC | 300.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | ST | 600.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | EWS | 585.00 |
| 2024 | - | M.Tech | OBC | 650.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 654.00 |
| 2024 | - | M.Tech | ST | 562.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | General | 750.00 |
| 2024 | - | M.Tech | OBC | 675.00 |
| 2024 | - | M.Tech | SC | 350.00 |
| 2024 | - | M.Tech | ST | 350.00 |
| 2024 | - | M.Mgt | General | 742.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | ST | 600.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | General | 925.00 |
| 2024 | - | M.Tech | OBC | 825.00 |
| 2024 | - | M.Tech | SC | 668.00 |
| 2024 | - | M.Tech | ST | 639.00 |
| 2024 | - | M.Tech | EWS | 703.00 |
| 2024 | - | M.Tech | General | 852.00 |
| 2024 | - | M.Tech | OBC | 769.00 |
| 2024 | - | M.Tech | SC | 519.00 |
| 2024 | - | M.Tech | ST | 431.00 |
| 2024 | - | M.Tech | EWS | 744.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 654.00 |
| 2024 | - | M.Tech | ST | 562.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | General | 721.00 |
| 2024 | - | M.Tech | OBC | 673.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 359.00 |
| 2024 | - | M.Tech | EWS | 686.00 |
| 2024 | - | M.Tech | General | 622.00 |
| 2024 | - | M.Tech | OBC | 595.00 |
| 2024 | - | M.Tech | SC | 393.00 |
| 2024 | - | M.Tech | ST | 424.00 |
| 2024 | - | M.Tech | EWS | 587.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | EWS | 632.00 |
| 2024 | - | M.Tech | General | 608.00 |
| 2024 | - | M.Tech | OBC | 505.00 |
| 2024 | - | M.Tech | SC | 360.00 |
| 2024 | - | M.Tech | ST | 310.00 |
| 2024 | - | M.Tech | EWS | 524.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 925.00 |
| 2024 | - | M.Tech | EWS | 703.00 |
| 2024 | - | M.Tech | OBC | 825.00 |
| 2024 | - | M.Tech | SC | 668.00 |
| 2024 | - | M.Tech | ST | 639.00 |
| 2024 | - | M.Tech | General | 852.00 |
| 2024 | - | M.Tech | EWS | 744.00 |
| 2024 | - | M.Tech | OBC | 769.00 |
| 2024 | - | M.Tech | SC | 519.00 |
| 2024 | - | M.Tech | ST | 431.00 |
| 2024 | - | M.Tech | General | 758.00 |
| 2024 | - | M.Tech | EWS | 600.00 |
| 2024 | - | M.Tech | OBC | 789.00 |
| 2024 | - | M.Tech | SC | 472.00 |
| 2024 | - | M.Tech | ST | 472.00 |
| 2024 | - | M.Tech | General | 950.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 855.00 |
| 2024 | - | M.Tech | SC | 636.00 |
| 2024 | - | M.Tech | ST | 636.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | General | 750.00 |
| 2024 | - | M.Tech | General | 350.00 |
| 2024 | - | M.Tech | General | 875.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 925.00 |
| 2024 | - | M.Tech | EWS | 703.00 |
| 2024 | - | M.Tech | OBC | 825.00 |
| 2024 | - | M.Tech | SC | 668.00 |
| 2024 | - | M.Tech | ST | 639.00 |
| 2024 | - | M.Tech | General | 852.00 |
| 2024 | - | M.Tech | EWS | 744.00 |
| 2024 | - | M.Tech | OBC | 769.00 |
| 2024 | - | M.Tech | SC | 519.00 |
| 2024 | - | M.Tech | ST | 431.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 665.00 |
| 2024 | - | M.Tech | EWS | 624.00 |
| 2024 | - | M.Tech | OBC | 420.00 |
| 2024 | - | M.Tech | SC | 245.00 |
| 2024 | - | M.Tech | ST | 600.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | EWS | 585.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2024 | - | M.Tech | ST | 390.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Mgt | General | 742.00 |
| 2024 | - | M.Mgt | OBC | 690.00 |
| 2024 | - | M.Mgt | SC | 535.00 |
| 2024 | - | M.Mgt | ST | 418.00 |
| 2024 | - | M.Mgt | EWS | 686.00 |
| 2024 | - | M.Mgt | General-PwD | 675.00 |
| 2024 | - | M.Tech | General | 892.00 |
| 2024 | - | M.Tech | EWS | 855.00 |
| 2024 | - | M.Tech | OBC | 787.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | ST | 440.00 |
| 2024 | - | M.Tech | General | 700.00 |
| 2024 | - | M.Tech | EWS | 650.00 |
| 2024 | - | M.Tech | OBC | 600.00 |
| 2024 | - | M.Tech | SC | 550.00 |
| 2024 | - | M.Tech | ST | 300.00 |
| 2024 | - | M.Tech | General | 713.00 |
| 2024 | - | M.Tech | EWS | 462.00 |
| 2024 | - | M.Tech | OBC | 612.00 |
| 2024 | - | M.Tech | SC | 486.00 |
| 2024 | - | M.Tech | General | 650.00 |
| 2024 | - | M.Tech | OBC | 650.00 |
| 2024 | - | M.Tech | SC | 390.00 |
| 2023 | Round 1 | - | General | 780.00 |
| 2023 | Round 1 | - | OBC-NCL | 720.00 |
| 2023 | Round 1 | - | SC | 510.00 |
| 2023 | Round 1 | - | ST | 480.00 |
| 2023 | Round 1 | - | EWS | 700.00 |
| 2023 | - | M.Tech | General | 844.00 |
| 2023 | - | M.Tech | EWS | 626.00 |
| 2023 | - | M.Tech | OBC | 712.00 |
| 2023 | - | M.Tech | SC | 525.00 |
| 2023 | - | M.Tech | ST | 427.00 |
IISc Bangalore CEED Cutoff (2025)
| Year | Branch / Programme | Category | Cutoff Score |
|---|---|---|---|
| 2025 | - | General | 58.00 |
| 2025 | - | OBC | 52.00 |
| 2025 | - | EWS | 52.00 |
| 2025 | - | SC | 30.00 |
| 2025 | - | ST | 30.00 |
| 2025 | - | General | 58.00 |
| 2025 | - | OBC | 52.00 |
IISc Bangalore IIT JAM Cutoff (2025, 2024)
| Year | Branch / Programme | Course | Category | Closing Rank | Cutoff Score |
|---|---|---|---|---|---|
| 2025 | - | M.Sc | General | - | 100.00 |
| 2025 | - | Integrated PhD | OBC | 260 | - |
| 2025 | - | Integrated PhD | SC | 500 | - |
| 2025 | - | Integrated PhD | EWS | 300 | - |
| 2025 | - | Integrated PhD | General | 90 | - |
| 2025 | - | Integrated PhD | General | 95 | - |
| 2025 | - | Integrated PhD | General | 200 | - |
| 2025 | - | Integrated PhD | General | 745 | - |
| 2025 | - | M.Sc | General | 90 | - |
| 2025 | - | M.Sc | OBC | 260 | - |
| 2025 | - | M.Sc | SC | 500 | - |
| 2025 | - | M.Sc | General | 95 | - |
| 2025 | - | M.Sc | General | 100 | - |
| 2025 | - | M.Sc | General | 205 | - |
| 2025 | - | M.Sc | General | 100 | - |
| 2025 | - | M.Sc | OBC | 150 | - |
| 2025 | - | M.Sc | SC | 500 | - |
| 2025 | - | M.Sc | ST | 500 | - |
| 2025 | - | M.Sc | EWS | 150 | - |
| 2025 | - | Integrated PhD | General | 90 | - |
| 2025 | - | Integrated PhD | OBC | 260 | - |
| 2025 | - | Integrated PhD | SC | 500 | - |
| 2025 | - | Integrated PhD | ST | 2,000 | - |
| 2025 | - | M.Sc | General | 90 | - |
| 2025 | - | M.Sc | General | 100 | - |
| 2025 | - | M.Sc | General | 200 | - |
| 2025 | - | M.Sc | General | 746 | - |
| 2025 | - | M.Sc | OBC | 959 | - |
| 2025 | - | M.Sc | OBC | 150 | - |
| 2025 | - | Integrated PhD | General | 90 | - |
| 2025 | - | Integrated PhD | General | 200 | - |
| 2025 | - | Integrated PhD | General | 746 | - |
| 2024 | - | Integrated PhD | General | 65 | - |
| 2024 | - | Integrated PhD | EWS | 80 | - |
| 2024 | - | Integrated PhD | OBC | 100 | - |
| 2024 | - | Integrated PhD | SC | 100 | - |
| 2024 | - | Integrated PhD | ST | 100 | - |
| 2024 | - | M.Sc | General | 75 | - |
| 2024 | - | M.Sc | OBC | 200 | - |
| 2024 | - | M.Sc | EWS | 150 | - |
| 2024 | - | M.Sc | SC | 720 | - |
| 2024 | - | M.Sc | ST | 4,000 | - |
| 2024 | - | M.Sc | OBC | 150 | - |
| 2024 | - | M.Sc | SC | 500 | - |
| 2024 | - | M.Sc | ST | 500 | - |
IISc Bangalore NEET UG Cutoff (2024)
| Year | Branch / Programme | Category | Closing Rank |
|---|---|---|---|
| 2024 | - | General | 600 |
| 2024 | - | EWS | 8,000 |
| 2024 | - | OBC | 7,500 |
| 2024 | - | SC | 21,000 |
| 2024 | - | ST | 31,000 |
| 2024 | - | General | 600 |
| 2024 | - | EWS | 8,000 |
| 2024 | - | OBC | 7,500 |
| 2024 | - | SC | 21,000 |
| 2024 | - | ST | 31,000 |
| 2024 | - | General | 600 |
| 2024 | - | OBC | 7,500 |
| 2024 | - | SC | 21,000 |
| 2024 | - | ST | 31,000 |
| 2024 | - | EWS | 8,000 |
| 2024 | - | General | 600 |
| 2024 | - | EWS | 8,000 |
| 2024 | - | OBC | 7,500 |
| 2024 | - | SC | 21,000 |
| 2024 | - | ST | 31,000 |
| 2024 | - | General-PwD | 50,000 |
| 2024 | - | General | 600 |
| 2024 | - | EWS | 8,000 |
| 2024 | - | OBC | 7,500 |
| 2024 | - | SC | 21,000 |
| 2024 | - | ST | 31,000 |
| 2024 | - | General | 600 |
| 2024 | - | EWS | 8,000 |
| 2024 | - | OBC | 7,500 |
| 2024 | - | SC | 21,000 |
| 2024 | - | ST | 31,000 |
| 2024 | - | General | 600 |
| 2024 | - | EWS | 8,000 |
| 2024 | - | OBC | 7,500 |
| 2024 | - | SC | 21,000 |
| 2024 | - | ST | 31,000 |
| 2024 | - | General-PwD | 50,000 |
| 2024 | - | General | 600 |
| 2024 | - | EWS | 8,000 |
| 2024 | - | OBC | 7,500 |
| 2024 | - | SC | 21,000 |
| 2024 | - | ST | 31,000 |
| 2024 | - | General | 600 |
| 2024 | - | EWS | 8,000 |
| 2024 | - | OBC | 7,500 |
| 2024 | - | SC | 21,000 |
| 2024 | - | ST | 31,000 |
| 2024 | - | General | 600 |
| 2024 | - | OBC | 7,500 |
| 2024 | - | SC | 21,000 |
| 2024 | - | ST | 31,000 |
| 2024 | - | EWS | 8,000 |
| 2024 | - | General-PwD | 50,000 |
| 2024 | - | General | 600 |
| 2024 | - | EWS | 8,000 |
| 2024 | - | OBC | 7,500 |
| 2024 | - | SC | 21,000 |
| 2024 | - | ST | 31,000 |
| 2024 | - | General-PwD | 50,000 |
| 2024 | - | General | 600 |
| 2024 | - | EWS | 8,000 |
| 2024 | - | OBC | 7,500 |
| 2024 | - | SC | 21,000 |
| 2024 | - | ST | 31,000 |
| 2024 | - | General-PwD | 50,000 |
| 2024 | - | General | 600 |
| 2024 | - | EWS | 8,000 |
| 2024 | - | OBC | 7,500 |
| 2024 | - | SC | 21,000 |
| 2024 | - | ST | 31,000 |
| 2024 | - | General | 353 |
| 2024 | Round 1 | General | 353 |
| 2024 | - | SC | 21,000 |
Frequently Asked Questions: Indian Institute of Science Bangalore Cutoff 2026
What rank is required to get into IISc Bangalore B.Tech in 2026?
For the new B.Tech Aerospace Engineering programme, the JoSAA 2026 Round 1 General-category closing rank was JEE Advanced All India Rank 3552, released on June 13, 2026. For the established B.Tech in Mathematics and Computing, the 2025 General closing rank was 856, so a top-900 JEE Advanced rank is the realistic target for that branch. Reserved-category cutoffs are lower, and the newer branches generally close at higher rank numbers in their first year.
Which entrance exam is accepted for IISc Bangalore admission?
IISc Bangalore admits undergraduates through JEE Advanced and JEE Main for its B.Tech and B.S. (Research) programmes, and through IIT JAM for the Integrated PhD pathway. The B.Tech programmes are now filled through JoSAA counselling alongside the IITs as of 2026. In 2025, the JEE Main route into B.S. (Research) closed at General rank 903, while the IIT JAM Integrated PhD General closing rank was 746.
What is the category-wise cutoff for IISc Bangalore B.Tech 2025?
For B.Tech Mathematics and Computing in 2025 (JEE Advanced closing ranks), the cutoffs were General 856, EWS 130, OBC-NCL 446, SC 265, ST 257 and General-PwD 37. These show how sharply the bar relaxes across categories, with reserved-category ranks running several hundred places behind the General cut. Use these as your 2025 baseline while confirming the current JoSAA 2026 round-wise figures on the official source.
Has the IISc Bangalore cutoff risen or fallen?
The B.Tech Mathematics and Computing General cutoff has held within a narrow elite band, moving from 757 in 2023 to 708 in 2024 and then to 856 in 2025. There is no steep one-directional trend; the swings reflect how top JEE Advanced rankers weigh IISc against IIT options. The 2026 Aerospace Engineering cutoff of 3552 is a debut figure with no prior year to compare against, and is expected to tighten in later rounds.
Which is the easiest branch to get into at IISc Bangalore?
Among IISc Bangalore's undergraduate options, the B.S. (Research) programme is the most accessible by rank, closing at JEE Advanced General rank 2263 in 2025 versus 856 for B.Tech Mathematics and Computing. Among the 2026 B.Tech branches, the newly launched Aerospace Engineering closed at General rank 3552 in JoSAA Round 1, making it more reachable than the long-running Mathematics and Computing seat for now.
What is the IISc Bangalore B.S. Research cutoff for SC and ST 2025?
For B.S. (Research) in 2025, the JEE Advanced closing ranks were SC 770 and ST 616, with OBC-NCL at 3073 and EWS at 978. Through the JEE Main route, the same programme closed at SC 581 and ST 314 in 2025. These reserved-category windows are considerably wider than the General closing rank of 2263 (JEE Advanced) for the programme.
Disclaimer: Cutoff ranks and scores listed for IISc Bangalore are based on previously published data from the relevant entrance exams and are indicative only. Actual cutoffs vary each year based on applicant pool and seat availability. Verify current cutoffs from the institute's official website or the respective exam authority's official website.